  "html_url": "https://postor.com.mx/licitacion/lo-85-w80-926008990-n-12-2023",
  "canonical": "https://postor.com.mx/licitacion/lo-85-w80-926008990-n-12-2023",
  "id": "4e6f70818cd543719a1a69cc263690de",
  "procedure_number": "LO-85-W80-926008990-N-12-2023",
  "file_number": "E-2023-00034525",
  "title": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO TRAMO 9",
  "description": {
    "short": null,
    "detailed": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO DEL PUEBLO YAQUI DEL KM 38+700 AL  55+931 Y ESTRUCTURAS (TRAMO 9), EN EL ESTADO DE SONORA"
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "SECRETARIA DE AGRICULTURA, GANADERÍA, RECURSOS HIDRÁULICOS, PESCA Y ACUACULTURA",
    "acronym": "085W80",
    "branch": "85 - SONORA",
    "buying_unit": "DIRECCIÓN GENERAL DE COSTOS, CONCURSOS Y CONTRATOS",
    "requesting_unit": null,
    "requesting_group": "DIRECCIÓN GENERAL DE COSTOS, CONCURSOS Y CONTRATOS",
    "entity": null,
    "slug": "085w80",
    "unit_slug": "direccion-general-de-costos-concursos-y-contratos-926008990"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2023,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "CEA-AIHSAEYE-IH-OB-23-013",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2023-05-24T15:22:21.000Z",
    "clarification_meeting_at": "2023-06-02T22:00:00.000Z",
    "clarification_questions_deadline_at": "2023-06-01T22:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2023-06-09T16:00:00.000Z",
    "award_at": "2023-06-27T17:00:00.000Z",
    "estimated_contract_at": "2023-07-01T06:00:00.000Z",
    "site_visit_at": "2023-05-29T17:00:00.000Z",
    "estimated_work_start_at": "2023-07-01T06:00:00.000Z"
  },
  "locations": {
    "state_id": "26",
    "state": "SONORA",
    "bid_opening": "SALA DE JUNTAS DE LA CEA, UBICADA EN BLVD VILDOSOLA S/N COL. VILLA DE SERIS, HERMOSILLO SONORA",
    "award": "SALA DE JUNTAS DE LA CEA, UBICADA EN BLVD VILDOSOLA S/N COL. VILLA DE SERIS, HERMOSILLO SONORA",
    "clarification_meeting": "SALA DE JUNTAS DE LA CEA, UBICADA EN BLVD VILDOSOLA S/N COL. VILLA DE SERIS, HERMOSILLO SONORA",
    "site_visit": "OFICINAS DE LA COMISARIA MUNICIPAL DE VICAM, MUNICIPIO DE GUAYMAS, ESTADO DE SONORA",
    "work_site": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO DEL PUEBLO YAQUI DEL KM 38+700 AL  55+931 Y ESTRUCTURAS (TRAMO 9), EN EL ESTADO DE SONORA"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "1",
    "supplier_percentage": "10",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "PUNTOS Y PORCENTAJES",
    "technical_points": "50",
    "economic_points": "50"
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": false,
    "other_insurance_description": null,
    "performance_reduction": "0"
  },
  "participation": {
    "method": "PRESENCIAL",
    "joint": true,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": false,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": true,
    "duration_days": "196",
    "procurement_term": "Recortado",
    "subcontracted_work": null,
    "deadline_justification": "ES NECESARIO CONTAR CON EL OBJETO DE ESTE PROCEDIMIENTO LO ANTES POSIBLE PARA PROVEER A LA ETNIA YAQUI LA CERTEZA DE UN MANEJO ADECUADO DE LAS AGUAS QUE PERMITEN EL RIEGO DE LAS TIERRAS DE SIEMBRA"
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62601-0009",
          "specific_item_code": "62601",
          "cucop_description": "CONSTRUCCION DE CANAL",
          "description": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO DEL PUEBLO YAQUI DEL KM 38+700 AL  55+931 Y ESTRUCTURAS (TRAMO 9), EN EL ESTADO DE SONORA",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "62601",
          "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "62601",
      "description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    }
  ],
  "awards": [
    {
      "id": "C-2023-00099620",
      "internal_reference": "CEA-AIHSAEYE-IH-OB-23-013",
      "title": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO TRAMO 9",
      "status": "PUBLICADO",
      "contractor": {
        "name": "PROYECTOS Y CONSTRUCCIONES VIRGO SA DE CV",
        "normalized_name": "PROYECTOS Y CONSTRUCCIONES VIRGO",
        "rfc_type": null,
        "slug": "proyectos-y-construcciones-virgo"
      },
      "contract_period": {
        "published_at": "2023-08-31T00:51:14.000Z",
        "starts_at": "2023-07-07T06:00:00.000Z",
        "ends_at": "2023-12-31T06:00:00.000Z"
      },
      "value": {
        "subtotal": "101981760.82",
        "tax": "16317081.73",
        "total": "118298842.55",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62601-0009",
          "description": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO DEL PUEBLO YAQUI DEL KM 38+700 AL  55+931 Y ESTRUCTURAS (TRAMO 9), EN EL ESTADO DE SONORA",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "101981760.82",
          "tax": "16317081.73",
          "other_taxes": null,
          "total": "118298842.55",
          "cucop_description": "CONSTRUCCION DE CANAL",
          "partida_code": "62601",
          "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "CONV CEA-AIHSAEYE-IH-OB-23-013 (OB) OK.pdf",
      "availability": "available",
      "size_bytes": "3087533",
      "mime_type": "application/pdf",
      "sha256": "d017f3a3d78285b39551b85922cb61da9404e51de35acf83b5ab83a65bb91aa9",
      "uploaded_at": "2025-12-07T12:50:14.104Z",
      "updated_at": "2026-08-05T21:56:11.526Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "res_Convocatoria_OP_Federal_3.pdf",
      "availability": "available",
      "size_bytes": "71147",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:15.278Z",
      "updated_at": "2025-12-07T12:50:15.280Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "N-12-2023 Acta Difer fallo 23-013.pdf",
      "availability": "available",
      "size_bytes": "1726252",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:52:09.803Z",
      "updated_at": "2025-12-07T12:52:09.804Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "1 Anexos Tecnicos a Bases FEDERAL.xls",
      "availability": "available",
      "size_bytes": "157184",
      "mime_type": "application/vnd.ms-excel",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:16.767Z",
      "updated_at": "2025-12-07T12:50:16.768Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "CAIDA PLANO GENERAL.pdf",
      "availability": "available",
      "size_bytes": "568781",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:19.168Z",
      "updated_at": "2025-12-07T12:50:19.169Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "CATALOGO TRAMO 9.xlsx",
      "availability": "available",
      "size_bytes": "40471",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:20.279Z",
      "updated_at": "2025-12-07T12:50:20.280Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ESPECIFICACIONES TRAMO 9.docx",
      "availability": "available",
      "size_bytes": "207172",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:21.487Z",
      "updated_at": "2025-12-07T12:50:21.488Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "PASO INFERIOR.pdf",
      "availability": "available",
      "size_bytes": "1128518",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:23.281Z",
      "updated_at": "2025-12-07T12:50:23.282Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "PUENTE VEHICULAR.pdf",
      "availability": "available",
      "size_bytes": "1460422",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:25.109Z",
      "updated_at": "2025-12-07T12:50:25.110Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "REPRESA.pdf",
      "availability": "available",
      "size_bytes": "442326",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:26.323Z",
      "updated_at": "2025-12-07T12:50:26.324Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "TOMA DIRECTA.pdf",
      "availability": "available",
      "size_bytes": "1005374",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:27.886Z",
      "updated_at": "2025-12-07T12:50:27.888Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "TOMA LATERAL.pdf",
      "availability": "available",
      "size_bytes": "403758",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:29.456Z",
      "updated_at": "2025-12-07T12:50:29.457Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "TRAMOS 9, 10 y 11 DEL km 38+700 a km 52+830_planta perfi-rev1l.dwg",
      "availability": "available",
      "size_bytes": "9448296",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:43.419Z",
      "updated_at": "2025-12-07T12:50:43.419Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "CONV CEA-AIHSAEYE-IH-OB-23-013 (OB) OK.pdf",
      "availability": "available",
      "size_bytes": "3087533",
      "mime_type": "application/pdf",
      "sha256": "d017f3a3d78285b39551b85922cb61da9404e51de35acf83b5ab83a65bb91aa9",
      "uploaded_at": "2025-12-07T12:50:50.599Z",
      "updated_at": "2026-08-05T21:56:11.526Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "JUNTA DE ACLARACIONES n12.pdf",
      "availability": "available",
      "size_bytes": "686410",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:51.927Z",
      "updated_at": "2025-12-07T12:50:51.929Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "03 PE-CPPY-TD-38+700-52+830-COMPUERTA.pdf",
      "availability": "available",
      "size_bytes": "535088",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:53.334Z",
      "updated_at": "2025-12-07T12:50:53.335Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "03 PE-CPPY-TD-38+700-52+830-ESTRUCTURAL.pdf",
      "availability": "available",
      "size_bytes": "842386",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:54.731Z",
      "updated_at": "2025-12-07T12:50:54.732Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "03 PE-CPPY-TD-38+700-52+830-TOMA DIRECTA MI.pdf",
      "availability": "available",
      "size_bytes": "1011873",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:50:59.679Z",
      "updated_at": "2025-12-07T12:50:59.680Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "CAIDA_40+720-PLANO GENERAL.pdf",
      "availability": "available",
      "size_bytes": "564821",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:03.330Z",
      "updated_at": "2025-12-07T12:51:03.331Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "ESPECIFICACIONES CAIDA 40+720.docx",
      "availability": "available",
      "size_bytes": "153071",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:04.656Z",
      "updated_at": "2025-12-07T12:51:04.657Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "2_6_11_PASO INFERIOR 42+520 5-31-23-ESTRUCTURAL.pdf",
      "availability": "available",
      "size_bytes": "773252",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:07.589Z",
      "updated_at": "2025-12-07T12:51:07.591Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "2_6_11_PASO INFERIOR 42+520 5-31-23-GEOMÃ¿TRICO.pdf",
      "availability": "available",
      "size_bytes": "833308",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:09.025Z",
      "updated_at": "2025-12-07T12:51:09.026Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "PPP-CPPY-38+700 AL 52+830-PPP-CPPY- 38+700 AL 40+000 1 DE 8.pdf",
      "availability": "available",
      "size_bytes": "967256",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:13.137Z",
      "updated_at": "2025-12-07T12:51:13.138Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "PPP-CPPY-38+700 AL 52+830-PPP-CPPY- 40+000 AL 42+000  2 DE 8.pdf",
      "availability": "available",
      "size_bytes": "855249",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:16.962Z",
      "updated_at": "2025-12-07T12:51:16.963Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "PPP-CPPY-38+700 AL 52+830-PPP-CPPY- 42+000 AL 44+000  3 DE 8.pdf",
      "availability": "available",
      "size_bytes": "1332160",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:19.625Z",
      "updated_at": "2025-12-07T12:51:19.626Z"
    },
    {
      "id": null,
      "annex_number": 17,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "ESPECIFICACIONES TECNICAS-PUENTE VEHICULAR.docx",
      "availability": "available",
      "size_bytes": "170972",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:21.661Z",
      "updated_at": "2025-12-07T12:51:21.662Z"
    },
    {
      "id": null,
      "annex_number": 18,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "PUENTE VEHICULAR 40+699-Estribo y detalles.pdf",
      "availability": "available",
      "size_bytes": "700131",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:23.598Z",
      "updated_at": "2025-12-07T12:51:23.599Z"
    },
    {
      "id": null,
      "annex_number": 19,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "PUENTE VEHICULAR 40+699-Plano General.pdf",
      "availability": "available",
      "size_bytes": "866499",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:27.644Z",
      "updated_at": "2025-12-07T12:51:27.645Z"
    },
    {
      "id": null,
      "annex_number": 20,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "PUENTE VEHICULAR 42+721-Estribo y detalles.pdf",
      "availability": "available",
      "size_bytes": "700034",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:32.335Z",
      "updated_at": "2025-12-07T12:51:32.336Z"
    },
    {
      "id": null,
      "annex_number": 21,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "PUENTE VEHICULAR 42+721-Plano General.pdf",
      "availability": "available",
      "size_bytes": "866396",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:36.517Z",
      "updated_at": "2025-12-07T12:51:36.519Z"
    },
    {
      "id": null,
      "annex_number": 22,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "Especificaciones_Tecnicas_Toma lateral 38+678 MI.docx",
      "availability": "available",
      "size_bytes": "415335",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:40.034Z",
      "updated_at": "2025-12-07T12:51:40.035Z"
    },
    {
      "id": null,
      "annex_number": 23,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "TOMA LATERAL_38+678_MI-PLANO GENERAL.pdf",
      "availability": "available",
      "size_bytes": "1056535",
      "mime_type": "application/pdf",
      "sha256": "6748906ca92fa9c8118641c03ea78d13ade0165a6c0c8581612feaca8b81756a",
      "uploaded_at": "2025-12-07T12:51:41.557Z",
      "updated_at": "2026-08-05T21:56:10.687Z"
    },
    {
      "id": null,
      "annex_number": 24,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "TOMA LATERAL_38+678_MI-PLANO GENERAL.pdf",
      "availability": "available",
      "size_bytes": "1056535",
      "mime_type": "application/pdf",
      "sha256": "6748906ca92fa9c8118641c03ea78d13ade0165a6c0c8581612feaca8b81756a",
      "uploaded_at": "2025-12-07T12:51:46.809Z",
      "updated_at": "2026-08-05T21:56:10.687Z"
    },
    {
      "id": null,
      "annex_number": 25,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "CATALOGO TRAMO 9 entregable.xlsx",
      "availability": "available",
      "size_bytes": "32210",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:47.898Z",
      "updated_at": "2025-12-07T12:51:47.899Z"
    },
    {
      "id": null,
      "annex_number": 26,
      "document_type": null,
      "description": "AVISO NUEVA JUNTA DE ACLARACIONES NO. 2",
      "filename": "conv junta aclaraciones 2 N-12.pdf",
      "availability": "available",
      "size_bytes": "708131",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:52.444Z",
      "updated_at": "2025-12-07T12:51:52.445Z"
    },
    {
      "id": null,
      "annex_number": 27,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "Acta de 2 da junta aclaraciones N-12.pdf",
      "availability": "available",
      "size_bytes": "1254675",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:51:55.022Z",
      "updated_at": "2025-12-07T12:51:55.023Z"
    },
    {
      "id": null,
      "annex_number": 28,
      "document_type": null,
      "description": "ACTA APERTURA DE PROPOSICIONES",
      "filename": "Acta apertura N-12-2023.pdf",
      "availability": "available",
      "size_bytes": "5495808",
      "mime_type": "application/pdf",
      "sha256": "b65bac3f4d5de3968a5930a41ca6c8a200c377afd1d8d86e6dd8af05b2e66865",
      "uploaded_at": "2025-12-07T12:52:00.182Z",
      "updated_at": "2026-08-05T21:56:12.295Z"
    },
    {
      "id": null,
      "annex_number": 29,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "Acta apertura N-12-2023.pdf",
      "availability": "available",
      "size_bytes": "5495808",
      "mime_type": "application/pdf",
      "sha256": "b65bac3f4d5de3968a5930a41ca6c8a200c377afd1d8d86e6dd8af05b2e66865",
      "uploaded_at": "2025-12-07T12:52:04.891Z",
      "updated_at": "2026-08-05T21:56:12.295Z"
    },
    {
      "id": null,
      "annex_number": 31,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "N-12-2023 Acta fallo y Fallo 23-013.pdf",
      "availability": "available",
      "size_bytes": "1576856",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T12:52:11.397Z",
      "updated_at": "2025-12-07T12:52:11.398Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-07-28T01:02:11.072Z",
    "last_seen_at": "2026-07-28T01:02:11.056Z",
    "first_seen_at": "2025-11-05T04:41:26.757Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2025-11-05T04:41:26.757Z"
  },
  "context": {
    "suppliers": [
      {
        "slug": "proyectos-y-construcciones-virgo",
        "name": "PROYECTOS Y CONSTRUCCIONES VIRGO SA DE CV",
        "total_contracts": 11,
        "total_awarded_amount": "733190531.19",
        "median_amount": "33199975.77",
        "distinct_buyers": 5,
        "first_contract_at": "2023-04-20T00:00:00.000Z",
        "last_contract_at": "2026-07-10T00:00:00.000Z",
        "with_this_buyer": {
          "contracts": 2,
          "amount": "263124113.78"
        },
        "refreshed_at": "2026-09-16T00:56:30.797Z"
      }
    ],
    "buyer": {
      "slug": "085w80",
      "name": "SECRETARIA DE AGRICULTURA, GANADERÍA, RECURSOS HIDRÁULICOS, PESCA Y ACUACULTURA",
      "total_procedures": 206,
      "distinct_suppliers": 101,
      "procedures_by_type": {
        "LICITACIÓN PÚBLICA": 74,
        "ADJUDICACIÓN DIRECTA": 88,
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 44
      },
      "refreshed_at": "2026-09-21T01:15:01.299Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-85-w80-926008990-n-13-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO TRAMO 10",
      "dependencia": "SECRETARIA DE AGRICULTURA, GANADERÍA, RECURSOS HIDRÁULICOS, PESCA Y ACUACULTURA",
      "siglas": "085W80",
      "score": 0.023448080523254422,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-06-27T12:00:00.000Z",
      "fecha_publicacion": "2023-05-24T09:28:54.000Z",
      "ganador": "DEPROYCO SA DE CV",
      "ganador_slug": "deproyco",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "122277282.77"
    },
    {
      "numero_procedimiento": "lo-85-w80-926008990-n-14-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DISTRITO DE RIEGO TRAMO 11",
      "dependencia": "SECRETARIA DE AGRICULTURA, GANADERÍA, RECURSOS HIDRÁULICOS, PESCA Y ACUACULTURA",
      "siglas": "085W80",
      "score": 0.026620359022031526,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-06-27T13:00:00.000Z",
      "fecha_publicacion": "2023-05-24T09:31:01.000Z",
      "ganador": "TALWIWI CONSTRUCCIONES SA DE CV",
      "ganador_slug": "talwiwi-construcciones",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "124820781.58"
    },
    {
      "numero_procedimiento": "lo-85-w80-926008990-n-7-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DR18 TRAMO 8",
      "dependencia": "085W80",
      "siglas": "085W80",
      "score": 0.0338211387831987,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-06-16T12:00:00.000Z",
      "fecha_publicacion": "2023-05-17T09:46:24.000Z",
      "ganador": "SIT COMUNICACIONES SA DE CV",
      "ganador_slug": "sit-comunicaciones",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "113430296.05"
    },
    {
      "numero_procedimiento": "lo-85-w80-926008990-n-2-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DR18 TRAMO 5",
      "dependencia": "085W80",
      "siglas": "085W80",
      "score": 0.037105231371362235,
      "anio_ejercicio": 2023,
      "estatus": "DESIERTO",
      "fecha_fallo": "2023-06-15T15:00:00.000Z",
      "fecha_publicacion": "2023-05-17T09:24:39.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-85-w80-926008990-n-3-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DR18 TRAMO 6",
      "dependencia": "085W80",
      "siglas": "085W80",
      "score": 0.03739825002545816,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-06-15T14:00:00.000Z",
      "fecha_publicacion": "2023-05-17T09:44:16.000Z",
      "ganador": "GRUPO EMPRESARIAL BABASAC SA DE CV",
      "ganador_slug": "grupo-empresarial-babasac",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "130813612.88"
    },
    {
      "numero_procedimiento": "lo-85-w80-926008990-n-30-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL CANAL PRINCIPAL DE LA AMPLIACIÓN DEL DR18 TRAMO 5",
      "dependencia": "SECRETARIA DE AGRICULTURA, GANADERÍA, RECURSOS HIDRÁULICOS, PESCA Y ACUACULTURA",
      "siglas": "085W80",
      "score": 0.038271696516027465,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-07-14T13:00:00.000Z",
      "fecha_publicacion": "2023-06-21T09:37:31.000Z",
      "ganador": "ARQUITECTURA Y DISEÑO COMPUTARIZADO SC",
      "ganador_slug": "arquitectura-y-diseno-computarizado",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "138741781.50"
    }
  ]
}