{
  "html_url": "https://postor.com.mx/licitacion/lo-70-q93-911008987-n-6-2025",
  "canonical": "https://postor.com.mx/licitacion/lo-70-q93-911008987-n-6-2025",
  "id": "404f528c7cd241339a75c7c7a3c70cb2",
  "procedure_number": "LO-70-Q93-911008987-N-6-2025",
  "file_number": "E-2025-00011489",
  "title": "CUARTA ETAPA DE INTERVENCIÓN MEDIANTE LA CONSTRUCCIÓN DE AULAS (MÓDULO 1), MÁS B",
  "description": {
    "short": null,
    "detailed": "CONSTRUCCIÓN DE 4 AULAS EN PLANTA ALTA DE 2.00 E.E. EN ESTRUCTURA U-2C CONSIDERANDO EL COMPLEMENTO DEL MÓDULO DE ESCALERAS, SUSTITUCIÓN DE BARDA PERIMETRAL CERRADA EN EL TRAMO NORTE; COMO OBRA COMPLEMENTARIA SE INCLUYE LA DEMOLICIÓN Y DESMANTELAMIENTO DEL MÓDULO 5E, ASÍ COMO, INSTALACIONES ELÉCTRICA, HIDRÁULICA Y PLUVIAL; EN LA INTERVENCIÓN AMBIENTAL SE CONSIDERA PODA Y PROTECCIÓN DE RAÍZ DE 8 ESPECIES, TRASPLANTE DE 3 ÁRBOLES Y 17 PODAS DE SANEAMIENTO."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "SICOM",
    "acronym": "SICOM",
    "branch": "70 - GUANAJUATO",
    "buying_unit": "DIRECCIÓN DE LICITACIONES Y CONTRATOS",
    "requesting_unit": null,
    "requesting_group": "DIRECCIÓN DE LICITACIONES Y PADRÓN ÚNICO DE CONTRATISTAS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "sicom",
    "unit_slug": "direccion-de-licitaciones-y-padron-unico-de-contratistas-911008987"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2025,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "GEGTO/SOP/ED/LP/RF/2025-006",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-02-13T21:55:11.000Z",
    "clarification_meeting_at": "2025-02-20T18:00:00.000Z",
    "clarification_questions_deadline_at": "2025-02-19T18:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2025-03-03T18:00:00.000Z",
    "award_at": "2025-03-11T20:08:00.000Z",
    "estimated_contract_at": "2025-03-26T06:00:00.000Z",
    "site_visit_at": "2025-02-19T17:00:00.000Z",
    "estimated_work_start_at": "2025-04-03T06:00:00.000Z"
  },
  "locations": {
    "state_id": "11",
    "state": "GUANAJUATO",
    "bid_opening": "HTTPS://DRIVE.GOOGLE.COM/FILE/D/13PIMWFEU080LLE-FKV-9JV9-LZQ0RIDN/VIEW?USP=DRIVE_LINK",
    "award": "HTTPS://DRIVE.GOOGLE.COM/FILE/D/13PIMWFEU080LLE-FKV-9JV9-LZQ0RIDN/VIEW?USP=DRIVE_LINK",
    "clarification_meeting": "HTTPS://DRIVE.GOOGLE.COM/FILE/D/13PIMWFEU080LLE-FKV-9JV9-LZQ0RIDN/VIEW?USP=DRIVE_LINK",
    "site_visit": "Acceso de la Primaria Dr. Cayetano Andrade, en el municipio de Moroleón, Gto.",
    "work_site": "Instalaciones de la Primaria Dr. Cayetano Andrade, en el municipio de Moroleón, Gto."
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "1",
    "supplier_percentage": "10",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "PUNTOS Y PORCENTAJES",
    "technical_points": "50",
    "economic_points": "50"
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": false,
    "other_insurance_description": null,
    "performance_reduction": null
  },
  "participation": {
    "method": "PRESENCIAL",
    "joint": true,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": null,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": true,
    "duration_days": "270",
    "procurement_term": "Normal",
    "subcontracted_work": null,
    "deadline_justification": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62201-0011",
          "specific_item_code": "62201",
          "cucop_description": "CONSTRUCCION DE ESCUELA",
          "description": "CONSTRUCCIÓN DE 4 AULAS EN PLANTA ALTA DE 2.00 E.E. EN ESTRUCTURA U-2C CONSIDERANDO EL COMPLEMENTO DEL MÓDULO DE ESCALERAS, SUSTITUCIÓN DE BARDA PERIMETRAL CERRADA EN EL TRAMO NORTE; COMO OBRA COMPLEMENTARIA SE INCLUYE LA DEMOLICIÓN Y DESMANTELAMIENTO DEL MÓDULO 5E, ASÍ COMO, INSTALACIONES ELÉCTRICA, HIDRÁULICA Y PLUVIAL; EN LA INTERVENCIÓN AMBIENTAL SE CONSIDERA PODA Y PROTECCIÓN DE RAÍZ DE 8 ESPECIES, TRASPLANTE DE 3 ÁRBOLES Y 17 PODAS DE SANEAMIENTO.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "62201",
          "partida_description": "OBRAS DE CONSTRUCCIÓN PARA EDIFICIOS NO HABITACIONALES"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "62201",
      "description": "OBRAS DE CONSTRUCCIÓN PARA EDIFICIOS NO HABITACIONALES"
    }
  ],
  "awards": [
    {
      "id": "C-2025-00026765",
      "internal_reference": "SOP/RF/LP/PU/DOA/OB/INFEDU/2025-0032",
      "title": "CUARTA ETAPA DE INTERVENCIÓN MEDIANTE LA CONSTRUCCIÓN DE AULAS (MÓDULO 1), MÁS B",
      "status": "PUBLICADO",
      "contractor": {
        "name": "SERGIO ESCAMILLA SILVA",
        "normalized_name": "SERGIO ESCAMILLA SILVA",
        "rfc_type": null
      },
      "contract_period": {
        "published_at": "2025-03-24T19:38:57.000Z",
        "starts_at": "2025-04-03T06:00:00.000Z",
        "ends_at": "2025-12-28T06:00:00.000Z"
      },
      "value": {
        "subtotal": "3174998.9",
        "tax": "507999.82",
        "total": "3682998.72",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62201-0011",
          "description": "CONSTRUCCIÓN DE 4 AULAS EN PLANTA ALTA DE 2.00 E.E. EN ESTRUCTURA U-2C CONSIDERANDO EL COMPLEMENTO DEL MÓDULO DE ESCALERAS, SUSTITUCIÓN DE BARDA PERIMETRAL CERRADA EN EL TRAMO NORTE; COMO OBRA COMPLEMENTARIA SE INCLUYE LA DEMOLICIÓN Y DESMANTELAMIENTO DEL MÓDULO 5E, ASÍ COMO, INSTALACIONES ELÉCTRICA, HIDRÁULICA Y PLUVIAL; EN LA INTERVENCIÓN AMBIENTAL SE CONSIDERA PODA Y PROTECCIÓN DE RAÍZ DE 8 ESPECIES, TRASPLANTE DE 3 ÁRBOLES Y 17 PODAS DE SANEAMIENTO.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "3174998.9",
          "tax": "507999.82",
          "other_taxes": null,
          "total": "3682998.72",
          "cucop_description": "CONSTRUCCION DE ESCUELA",
          "partida_code": "62201",
          "partida_description": "OBRAS DE CONSTRUCCIÓN PARA EDIFICIOS NO HABITACIONALES"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "Convoca 006.pdf",
      "availability": "available",
      "size_bytes": "295295",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T18:59:39.922Z",
      "updated_at": "2025-11-03T18:59:39.923Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Cayetano And.xlsx",
      "availability": "available",
      "size_bytes": "168225",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-11-03T19:00:30.171Z",
      "updated_at": "2025-11-03T19:00:30.171Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "CTO FED.doc",
      "availability": "available",
      "size_bytes": "216064",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-11-03T19:01:16.978Z",
      "updated_at": "2025-11-03T19:01:16.979Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "BASES LICITACION",
      "filename": "BASES 006.pdf",
      "availability": "available",
      "size_bytes": "570964",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T19:02:07.548Z",
      "updated_at": "2025-11-03T19:02:07.549Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "V y JA 2025-006.pdf",
      "availability": "available",
      "size_bytes": "5179254",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T19:02:54.594Z",
      "updated_at": "2025-11-03T19:02:54.595Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "A 2025-006.pdf",
      "availability": "available",
      "size_bytes": "6341322",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T19:03:47.405Z",
      "updated_at": "2025-11-03T19:03:47.407Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "Fallo 2025-006.pdf",
      "availability": "available",
      "size_bytes": "12885374",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T19:05:03.679Z",
      "updated_at": "2025-11-03T19:05:03.680Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-08-02T13:10:01.231Z",
    "last_seen_at": "2026-08-02T13:44:02.929Z",
    "first_seen_at": "2025-11-03T18:58:56.788Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2025-11-03T18:58:56.788Z"
  },
  "context": {
    "buyer": {
      "slug": "sicom",
      "name": "SECRETARÍA DE OBRA PÚBLICA",
      "total_procedures": 146,
      "distinct_suppliers": 63,
      "procedures_by_type": {
        "LICITACIÓN PÚBLICA": 87,
        "ADJUDICACIÓN DIRECTA": 32,
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 27
      },
      "refreshed_at": "2026-09-26T00:15:05.012Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-70-q93-911008987-n-26-2025",
      "nombre_procedimiento": "CONSTRUCCIÓN DE 15 AULAS, 1 AULA DE USOS MÚLTIPLES, 1 AULA USAER Y BARDA PERIMET",
      "dependencia": "SICOM",
      "siglas": "SICOM",
      "score": 0.06487767728370075,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-09-09T15:00:00.000Z",
      "fecha_publicacion": "2025-08-11T15:39:24.000Z",
      "ganador": "CONSTRUCTORA Y EDIFICADORA GUANAJUATENSE SA DE CV",
      "ganador_slug": "constructora-y-edificadora-guanajuatense",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "18600949.57"
    },
    {
      "numero_procedimiento": "lo-70-q93-911008987-n-18-2024",
      "nombre_procedimiento": "CONSTRUCCIÓN DE 7 AULAS, MÁS BARDA PERIMETRAL, EN EL VIDEOBACHILLERATO SABES PLA",
      "dependencia": "SECRETARÍA DE OBRA PÚBLICA",
      "siglas": "SICOM",
      "score": 0.10495204359005705,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-04-30T15:00:00.000Z",
      "fecha_publicacion": "2024-04-04T13:16:17.000Z",
      "ganador": "ALTEC INGENIERIA  Y ARQUITECTURA SA DE CV",
      "ganador_slug": "altec-ingenieria-y-arquitectura",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "8857842.23"
    },
    {
      "numero_procedimiento": "lo-70-q93-911008987-n-40-2024",
      "nombre_procedimiento": "SEGUNDA ETAPA DE MÓDULO U-3C EN LA ESCUELA NORMAL OFICIAL DE IRAPUATO CON C.C.T.",
      "dependencia": "SICOM",
      "siglas": "SICOM",
      "score": 0.10728847341009973,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-12-19T15:00:00.000Z",
      "fecha_publicacion": "2024-11-28T16:02:53.000Z",
      "ganador": "JORGE MAURICIO MARTIN DEL CAMPO HERNANDEZ",
      "ganador_slug": "jorge-mauricio-martin-del-campo-hernandez",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "12999775.57"
    },
    {
      "numero_procedimiento": "lo-70-q93-911008987-n-9-2024",
      "nombre_procedimiento": "CONSTRUCCIÓN DE 4 AULAS, MÁS SERVICIO SANITARIO, MÁS BARDA PERIMETRAL, MÁS REHAB",
      "dependencia": "SICOM",
      "siglas": "SICOM",
      "score": 0.11384997111110806,
      "anio_ejercicio": 2024,
      "estatus": "DESIERTO",
      "fecha_fallo": "2024-02-19T15:30:00.000Z",
      "fecha_publicacion": "2024-01-25T14:42:34.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-70-q93-911008987-n-20-2026",
      "nombre_procedimiento": "TERMINACIÓN DE LA CONSTRUCCIÓN DEL MÓDULO 1A MÁS OBRA COMPLEMENTARIA, EN EL CECY",
      "dependencia": "SECRETARÍA DE OBRA PÚBLICA",
      "siglas": "SICOM",
      "score": 0.11495950475455452,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-06-23T17:00:00.000Z",
      "fecha_publicacion": "2026-05-29T12:37:57.000Z",
      "ganador": "INDUSTRIAS BEFLO SA DE CV",
      "ganador_slug": "industrias-beflo",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "7278489.72"
    },
    {
      "numero_procedimiento": "lo-70-q93-911008987-n-6-2024",
      "nombre_procedimiento": "\"CONSTRUCCIÓN DE 2 AULAS, MÁS SERVICIO SANITARIO CON DIRECCIÓN, EN EL JARDÍN DE",
      "dependencia": "SECRETARÍA DE OBRA PÚBLICA",
      "siglas": "SICOM",
      "score": 0.11565391830755256,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-02-15T15:00:00.000Z",
      "fecha_publicacion": "2024-01-23T14:08:46.000Z",
      "ganador": "GERARDO MANUEL TORRES ARRIAGA",
      "ganador_slug": "gerardo-manuel-torres-arriaga",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "3395973.60"
    }
  ]
}