  "html_url": "https://postor.com.mx/licitacion/lo-62-o12-903035991-n-1-2026",
  "canonical": "https://postor.com.mx/licitacion/lo-62-o12-903035991-n-1-2026",
  "resumen": "La licitación pública LO-62-O12-903035991-N-1-2026 fue publicada por INSTITUTO SUDCALIFORNIANO DE LA INFRAESTRUCTURA FÍSICA EDUCATIVA el 5 de octubre de 2026 para bachillerato nacional margarita maza, plantel la paz. La contratación corresponde a Baja California Sur. El expediente incluye 21 anexos y 1 partida.",
  "id": "20acc9f9f9da4965b728ccfaa6a711f3",
  "procedure_number": "LO-62-O12-903035991-N-1-2026",
  "file_number": "E-2026-00109089",
  "title": "BACHILLERATO NACIONAL MARGARITA MAZA, PLANTEL LA PAZ",
  "description": {
    "short": null,
    "detailed": "CONSTRUCCIÓN DE BACHILLERATO NACIONAL DE NUEVA CREACIÓN: DOS EDIFICIOS EN ESTRUCTURA U1-C Y OBRA EXTERIOR QUE INCLUYE: PLAZA CÍVICA CON TECHUMBRE METÁLICA DE 10.00 X 18.00 MTS, CISTERNA DE 10,000 LTS, ACCESO PRINCIPAL, BARDA, CERCO PERIMETRAL Y ANDADORES DE CONEXIÓN."
  },
  "lifecycle": {
    "section": "vigente",
    "source_status": "VIGENTE PAP",
    "moved_at": null
  },
  "buyer": {
    "agency": "INSTITUTO SUDCALIFORNIANO DE LA INFRAESTRUCTURA FÍSICA EDUCATIVA",
    "acronym": "ISIFE",
    "branch": "62 - BAJA CALIFORNIA SUR",
    "buying_unit": "DIRECCION GENERAL",
    "requesting_unit": null,
    "requesting_group": "DIRECCION GENERAL",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "isife",
    "siglas_legibles": "ISIFE",
    "nombre_legible": "Instituto Sudcaliforniano de la Infraestructura Física Educativa",
    "articulo": "el",
    "unit_slug": "direccion-general-903035991"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2026,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "PFP-BNMM-03-26/01",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2026-10-05T21:59:14.000Z",
    "clarification_meeting_at": "2026-10-16T19:00:00.000Z",
    "clarification_questions_deadline_at": "2026-10-15T19:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2026-10-22T19:00:00.000Z",
    "award_at": "2026-10-26T19:00:00.000Z",
    "estimated_contract_at": "2026-10-30T06:00:00.000Z",
    "site_visit_at": null,
    "estimated_work_start_at": "2026-11-09T06:00:00.000Z"
  },
  "locations": {
    "state_id": "3",
    "state": "BAJA CALIFORNIA SUR",
    "bid_opening": "SALA DE JUNTAS DEL ISIFE",
    "award": "SALA DE JUNTAS DEL ISIFE",
    "clarification_meeting": "SALA DE JUNTAS DEL ISIFE",
    "site_visit": null,
    "work_site": "LA PAZ, BAJA CALIFORNA SUR."
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "size_tier": {
    "level": 3,
    "label": "$$$",
    "source": "ai"
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "30",
    "supplier_percentage": "10",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "PUNTOS Y PORCENTAJES",
    "technical_points": "50",
    "economic_points": "50"
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": false,
    "other_insurance_description": null,
    "performance_reduction": null
  },
  "participation": {
    "method": "ELECTRÓNICA",
    "joint": true,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": true,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": false,
    "duration_days": "150",
    "procurement_term": "Normal",
    "subcontracted_work": "CONCRETOS PREMEZCLADOS, MAQUINARIA PESADA, EQUIPOS ESPECIALES, TRABAJOS ESPECIALES Y LABORATORIO DE MATERIALES.",
    "deadline_justification": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "0",
          "cucop_code": "61200-0111",
          "specific_item_code": "61200",
          "cucop_description": "CONSTRUCCION DE ESCUELA",
          "description": "BACHILLERATO NACIONAL MARGARITA MAZA, PLANTEL LA PAZ",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "61200",
          "partida_description": "EDIFICACIÓN NO HABITACIONAL"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "61200",
      "description": "EDIFICACIÓN NO HABITACIONAL"
    }
  ],
  "awards": [],
  "documents": [
    {
      "id": "addf4e8a-7a36-410f-9ba6-d3fbfa719342",
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "bases PFP03 01.doc",
      "availability": "available",
      "size_bytes": "557568",
      "mime_type": "application/msword",
      "sha256": "70b0b7276bc3b14aadce7b0a5fb35bff98ad5cd5581efa7bf39092029676c184",
      "uploaded_at": "2026-10-05T22:01:19.711Z",
      "updated_at": "2026-10-05T22:01:48.067Z"
    },
    {
      "id": "e1b28218-b432-4d44-a2ad-c4329db299a0",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO 1 EJ_H.xls",
      "availability": "available",
      "size_bytes": "126976",
      "mime_type": "application/vnd.ms-excel",
      "sha256": "89a337d7680be6bd33fa8f477ea2ee0bb3c0a8d3e9125112a2e6635ce6f688ae",
      "uploaded_at": "2026-10-05T22:01:21.147Z",
      "updated_at": "2026-10-05T22:01:47.812Z"
    },
    {
      "id": "34da655a-e684-41c3-a4ce-93f6a52540b2",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO 2 EJ_H.xls",
      "availability": "available",
      "size_bytes": "95744",
      "mime_type": "application/vnd.ms-excel",
      "sha256": "4f9517e566315e1392fa3e7b5b0fee6a63c9b21f41b45bd036d7cd6e767f042c",
      "uploaded_at": "2026-10-05T22:01:23.030Z",
      "updated_at": "2026-10-05T22:01:47.807Z"
    },
    {
      "id": "e2c19654-eef4-4a93-b4d5-79a3258337da",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Anexo_Contrato.doc",
      "availability": "available",
      "size_bytes": "54784",
      "mime_type": "application/msword",
      "sha256": "96a4f79c45ae585db1ff15a71ec633eb725d61f6966acaf0a299b3a59614b32e",
      "uploaded_at": "2026-10-05T22:01:24.481Z",
      "updated_at": "2026-10-05T22:01:48.070Z"
    },
    {
      "id": "84293f2b-e381-4299-9f3a-12bb010c13de",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "CAT PFP 01.xlsm",
      "availability": "available",
      "size_bytes": "184595",
      "mime_type": "application/octet-stream",
      "sha256": "a7f3f490078900c41452f8772a6f07a7271a2219b7b8f300c7f5a3c6d1bc9e47",
      "uploaded_at": "2026-10-05T22:01:26.197Z",
      "updated_at": "2026-10-05T22:01:48.074Z"
    },
    {
      "id": "ffd5cdce-c531-47dd-8cb5-f127141b693c",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Datos FIANZAS.PDF",
      "availability": "available",
      "size_bytes": "93793",
      "mime_type": "application/pdf",
      "sha256": "f8c8acd782f9cb949594af8bce71421acf384bc15c891f2394499a291e2fa8b8",
      "uploaded_at": "2026-10-05T22:01:27.495Z",
      "updated_at": "2026-10-05T22:01:47.810Z"
    },
    {
      "id": "af2d2006-302e-4b51-8951-8042924cc3bc",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "EJ_H Y R.doc",
      "availability": "available",
      "size_bytes": "89600",
      "mime_type": "application/msword",
      "sha256": "c03749d6afc97ceb268c4c36a75022bad128035e7058c1b6fbee1ac497a4f1f0",
      "uploaded_at": "2026-10-05T22:01:28.977Z",
      "updated_at": "2026-10-05T22:01:47.814Z"
    },
    {
      "id": "b21a6eb6-390e-47eb-bba2-11e670fc6bc7",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ESTRAT_MPYMES.pdf",
      "availability": "available",
      "size_bytes": "19036",
      "mime_type": "application/pdf",
      "sha256": "c3ea4c8de24f93162c43fa2eaf5c9b95e8e40c4c8eca2accfd28d21f1c258a1c",
      "uploaded_at": "2026-10-05T22:01:30.392Z",
      "updated_at": "2026-10-05T22:01:48.072Z"
    },
    {
      "id": "0abd1682-de17-48ec-a8ee-c6d7012f00ff",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Escrito MIPyME.doc",
      "availability": "available",
      "size_bytes": "26112",
      "mime_type": "application/msword",
      "sha256": "362df0a51f7aefe0cc842ea9e095a5c93a97e030476bbca4c9e32527c5a7521a",
      "uploaded_at": "2026-10-05T22:01:31.725Z",
      "updated_at": "2026-10-05T22:01:48.077Z"
    },
    {
      "id": "9ba00aca-543b-452f-82b5-51f9793b1e51",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "FORMAT anexo A.doc",
      "availability": "available",
      "size_bytes": "39424",
      "mime_type": "application/msword",
      "sha256": "bcce39b32630ea3a791c6d6a85c15826b66840880dc819109f3ff089f7d7b052",
      "uploaded_at": "2026-10-05T22:01:33.452Z",
      "updated_at": "2026-10-05T22:01:47.816Z"
    },
    {
      "id": "410f15c0-5db4-4286-821d-69037aa468be",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "M_Contrato.docx",
      "availability": "available",
      "size_bytes": "64292",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": "4770efa2c65e55125caaba3550ddc5580f1dbfb9b3188f633981c9627513ad9e",
      "uploaded_at": "2026-10-05T22:01:35.030Z",
      "updated_at": "2026-10-05T22:01:47.942Z"
    },
    {
      "id": "e9518a4f-b699-4861-8d94-567782677f7f",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "PROG OBRA.xls",
      "availability": "available",
      "size_bytes": "519168",
      "mime_type": "application/vnd.ms-excel",
      "sha256": "6f1f292b2c3412d16f1ba250847805b7b0b8b77b8bef648a267884f06123999a",
      "uploaded_at": "2026-10-05T22:01:37.475Z",
      "updated_at": "2026-10-05T22:01:48.060Z"
    },
    {
      "id": "7fb56563-d0f1-4f16-9131-39a356cbddc4",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Pliego_prop PFP.doc",
      "availability": "available",
      "size_bytes": "30208",
      "mime_type": "application/msword",
      "sha256": "61b25e9be86fb68c981ad1efbe945c269ad71d45619322dafb8d7d2ab48267ed",
      "uploaded_at": "2026-10-05T22:01:38.834Z",
      "updated_at": "2026-10-05T22:01:47.818Z"
    },
    {
      "id": "5cef71d0-0817-493f-b47c-a4077ddb3e5a",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Port SOBRE PFP.doc",
      "availability": "available",
      "size_bytes": "405504",
      "mime_type": "application/msword",
      "sha256": "573871ff98b0cbdcfdf6474db128c5e223d45d904f995b8a1d383c31dc5c4029",
      "uploaded_at": "2026-10-05T22:01:40.555Z",
      "updated_at": "2026-10-05T22:01:48.062Z"
    },
    {
      "id": "971c054c-f8c6-43b2-9acb-a869e89bdecb",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "REL_EQUIPO.xls",
      "availability": "available",
      "size_bytes": "531968",
      "mime_type": "application/vnd.ms-excel",
      "sha256": "397c6ade1a7f279eb2bc1474e4fb33fe875b19b22651813110adf55a237ce594",
      "uploaded_at": "2026-10-05T22:01:42.041Z",
      "updated_at": "2026-10-05T22:01:47.819Z"
    },
    {
      "id": "e16cfa85-cbc5-40a3-b0c8-9457a304cc4c",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Separadores.doc",
      "availability": "available",
      "size_bytes": "402944",
      "mime_type": "application/msword",
      "sha256": "40b6c58a454c4cd37402fa6ca3efae5732aea375ebed7dfe0acb04b350a8e960",
      "uploaded_at": "2026-10-05T22:01:44.834Z",
      "updated_at": "2026-10-05T22:01:48.064Z"
    },
    {
      "id": "319ed48e-b2f9-4c98-ab22-1ecafb969926",
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "bases PFP03 01.doc",
      "availability": "available",
      "size_bytes": "557568",
      "mime_type": "application/msword",
      "sha256": "70b0b7276bc3b14aadce7b0a5fb35bff98ad5cd5581efa7bf39092029676c184",
      "uploaded_at": "2026-10-05T22:01:46.281Z",
      "updated_at": "2026-10-05T22:01:47.821Z"
    },
    {
      "id": "4ebd0d60-f67e-4aca-bf21-9ce5b8c3bbc5",
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "M_Contrato.docx",
      "availability": "available",
      "size_bytes": "64292",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": "4770efa2c65e55125caaba3550ddc5580f1dbfb9b3188f633981c9627513ad9e",
      "uploaded_at": "2026-10-05T22:01:47.284Z",
      "updated_at": "2026-10-05T22:01:48.056Z"
    },
    {
      "id": "a02e03c3-da76-47ad-9a3b-31990e32f94f",
      "annex_number": 5,
      "document_type": null,
      "description": "AVISO. SE ADJUNTA PROYECTO EJECUTIVO",
      "filename": "PROY PFP01.pdf",
      "availability": "available",
      "size_bytes": "7169698",
      "mime_type": "application/pdf",
      "sha256": "0fbb58bfc5f1a635bc57dcb43f9a4f848d799588d2396f64b73892e0a020bb06",
      "uploaded_at": "2026-10-08T17:11:35.574Z",
      "updated_at": "2026-10-08T17:11:36.102Z"
    },
    {
      "id": "7eceadfe-5687-458c-8d1c-07767394485b",
      "annex_number": 6,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "Acta PFP 01.pdf",
      "availability": "available",
      "size_bytes": "593663",
      "mime_type": "application/pdf",
      "sha256": "c2c8a74d01f1bb08e4c37be0c31404db212a3309d006c3c7a1be3e6bd881881f",
      "uploaded_at": "2026-10-18T00:30:22.932Z",
      "updated_at": "2026-10-18T00:30:23.822Z"
    },
    {
      "id": "7a9b6eae-12d7-4fe6-8f9d-0bb429498381",
      "annex_number": 6,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "ACTA_JA_LO-62-O12-903035991-N-1-2026.pdf",
      "availability": "available",
      "size_bytes": "1490111",
      "mime_type": "application/pdf",
      "sha256": "12acf9aff8dd3497eff57b877a37ff23e2358ca0954d975527534ee80a7e7a91",
      "uploaded_at": "2026-10-19T17:27:30.226Z",
      "updated_at": "2026-10-19T17:27:30.755Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-10-20T20:57:42.011Z",
    "last_seen_at": "2026-10-20T17:35:13.046Z",
    "first_seen_at": "2026-10-05T22:00:18.662Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2026-10-19T17:30:06.268Z"
  },
  "context": {
    "buyer": {
      "slug": "isife",
      "name": "INSTITUTO SUDCALIFORNIANO DE LA INFRAESTRUCTURA FÍSICA EDUCATIVA",
      "total_procedures": 51,
      "distinct_suppliers": 25,
      "procedures_by_type": {
        "LICITACIÓN PÚBLICA": 5,
        "ADJUDICACIÓN DIRECTA": 28,
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 18
      },
      "procedures_by_year": {
        "2022": 16,
        "2023": 17,
        "2024": 9,
        "2025": 7,
        "2026": 2
      },
      "is_indexable": true,
      "vigentes": 2,
      "refreshed_at": "2026-10-19T17:30:06.268Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-61-n92-902047975-n-2-2026",
      "nombre_procedimiento": "CONSTRUCCION DE BACHILLERATO NACIONAL \"MARGARITA MAZA\", TIJUANA, B.C.",
      "dependencia": "INSTITUTO DE LA INFRAESTRUCTURA FÍSICA EDUCATIVA DE BAJA CALIFORNIA",
      "siglas": "INIFEBC",
      "score": 0.18531318727888768,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-10-13T13:00:00.000Z",
      "fecha_publicacion": "2026-09-18T16:59:39.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-78-u13-919018982-n-20-2026",
      "nombre_procedimiento": "LO-919018982-E20-2026",
      "dependencia": "INSTITUTO CONSTRUCTOR DE INFRAESTRUCTURA FISICA EDUCATIVA Y DEPORTIVA DE NUEVO LEON",
      "siglas": "ICIFED",
      "score": 0.1881094203125725,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-09-17T16:40:00.000Z",
      "fecha_publicacion": "2026-09-01T17:11:11.000Z",
      "ganador": "REALCO CONSTRUCTORA SA DE CV",
      "ganador_slug": "realco-constructora",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "18405634.07"
    },
    {
      "numero_procedimiento": "lo-69-014-910029993-n-6-2026",
      "nombre_procedimiento": "2677101-26",
      "dependencia": "INSTITUTO PARA LA INFRAESTRUCTURA FÍSICA EDUCATIVA DEL ESTADO DE DURANGO",
      "siglas": "INIFEED",
      "score": 0.18820641005654326,
      "anio_ejercicio": 2026,
      "estatus": "EN EVALUACIÓN",
      "fecha_fallo": "2026-10-23T12:10:00.000Z",
      "fecha_publicacion": "2026-09-28T15:53:18.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-78-u13-919018982-n-19-2026",
      "nombre_procedimiento": "LO-919018982-E19-2026",
      "dependencia": "INSTITUTO CONSTRUCTOR DE INFRAESTRUCTURA FISICA EDUCATIVA Y DEPORTIVA DE NUEVO LEON",
      "siglas": "ICIFED",
      "score": 0.19094607803064778,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-09-17T16:30:00.000Z",
      "fecha_publicacion": "2026-09-01T16:50:37.000Z",
      "ganador": "CONSTRUCTORA Y ARRENDADORA SAN SEBASTIAN SA DE CV",
      "ganador_slug": "constructora-y-arrendadora-san-sebastian",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "18397293.77"
    },
    {
      "numero_procedimiento": "lo-91-z37-932045994-n-2-2026",
      "nombre_procedimiento": "LO-91-Z37-932045994-N-1-2026",
      "dependencia": "INSTITUTO ZACATECANO PARA LA CONSTRUCCIÓN DE ESCUELAS",
      "siglas": "INZACE",
      "score": 0.19109057108377525,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-10-09T13:00:00.000Z",
      "fecha_publicacion": "2026-09-22T21:25:56.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-91-z37-932045994-n-1-2026",
      "nombre_procedimiento": "LO-91-Z37-932045994-N-1-2026",
      "dependencia": "INSTITUTO ZACATECANO PARA LA CONSTRUCCIÓN DE ESCUELAS",
      "siglas": "INZACE",
      "score": 0.191413974506079,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-10-09T12:00:00.000Z",
      "fecha_publicacion": "2026-09-22T21:02:27.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    }
  ]
}