  "procedure_number": "LO-48-D00-048D00004-N-27-2025",
  "file_number": "E-2025-00050884",
  "title": "SEGUNDA ETAPA DE OBRA REESTRUCTURACIÓN. TEMPLO DE SAN NICOLÁS TOLENTINO, PUEBLA",
  "description": {
    "short": null,
    "detailed": "SEGUNDA ETAPA DE LA OBRA PARA REESTRUCTURACIÓN, REHABILITACIÓN Y RESARCIMIENTO DE DAÑOS RELACIONADOS CON EL SISMO DEL 19 DE SEPTIEMBRE DE 2017, EN EL TEMPLO DE SAN NICOLÁS TOLENTINO, UBICADO EN LA LOCALIDAD DE SAN NICOLÁS TOLENTINO, MUNICIPIO DE IZÚCAR DE MATAMOROS, EN EL ESTADO DE PUEBLA."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "INAH",
    "acronym": "INAH",
    "branch": "48 - CULTURA",
    "buying_unit": "COORDINACION NACIONAL DE OBRAS Y PROYECTOS",
    "requesting_unit": null,
    "requesting_group": "COORDINACION NACIONAL DE OBRAS Y PROYECTOS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "inah",
    "unit_slug": "coordinacion-nacional-de-obras-y-proyectos-048d00004"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2025,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "INAH OP RRTSNT 20/2025 - LPN",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-06-12T23:17:26.000Z",
    "clarification_meeting_at": "2025-06-20T21:00:00.000Z",
    "clarification_questions_deadline_at": "2025-06-19T21:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2025-06-26T19:00:00.000Z",
    "award_at": "2025-07-16T21:00:00.000Z",
    "estimated_contract_at": "2025-07-31T06:00:00.000Z",
    "site_visit_at": "2025-06-19T21:00:00.000Z",
    "estimated_work_start_at": "2025-07-31T06:00:00.000Z"
  },
  "locations": {
    "state_id": "7",
    "state": "CIUDAD DE MÉXICO",
    "bid_opening": "SALA DE USOS MÚLTIPLES DE LA COORDINACIÓN NACIONAL DE OBRAS Y PROYECTOS, UBICADAS EN: CALLE ARAGÓN NO. 195, PISO 1, COL. ALÁMOS, C.P. 03400, ALCALDÍA BENITO JUÁREZ, CIUDAD DE MÉXICO.",
    "award": "SALA DE USOS MÚLTIPLES DE LA COORDINACIÓN NACIONAL DE OBRAS Y PROYECTOS, UBICADAS EN: CALLE ARAGÓN NO. 195, PISO 1, COL. ALÁMOS, C.P. 03400, ALCALDÍA BENITO JUÁREZ, CIUDAD DE MÉXICO.",
    "clarification_meeting": "TEMPLO DE SAN NICOLÁS TOLENTINO, CALLE ALDAMA NO. 10, SAN NICOLÁS TOLENTINO, IZUCAR DE MATAMOROS, PUEBLA",
    "site_visit": "Templo de San Nicolás Tolentino, Calle Aldama No. 10, San Nicolás Tolentino, Izucar de Matamoros, Puebla",
    "work_site": "Templo de San Nicolás Tolentino, Calle Aldama No. 10, San Nicolás Tolentino, Izucar de Matamoros, Puebla"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "1",
    "supplier_percentage": "20",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "BINARIO",
    "technical_points": null,
    "economic_points": null
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": false,
    "other_insurance_description": null,
    "performance_reduction": null
  },
  "participation": {
    "method": "ELECTRÓNICA",
    "joint": true,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": null,
    "emergency": null,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": true,
    "duration_days": "140",
    "procurement_term": "Normal",
    "subcontracted_work": null,
    "deadline_justification": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62202-0001",
          "specific_item_code": "62202",
          "cucop_description": "CONSERVACION Y/O MANTENIMIENTO DE EDIFICIOS DE UNA, DOS O MULTIPLES VIVIENDAS NO HABITACIONAL",
          "description": "SEGUNDA ETAPA DE LA OBRA PARA REESTRUCTURACIÓN, REHABILITACIÓN Y RESARCIMIENTO DE DAÑOS RELACIONADOS CON EL SISMO DEL 19 DE SEPTIEMBRE DE 2017, EN EL TEMPLO DE SAN NICOLÁS TOLENTINO, UBICADO EN LA LOCALIDAD DE SAN NICOLÁS TOLENTINO, MUNICIPIO DE IZÚCAR DE MATAMOROS, EN EL ESTADO DE PUEBLA.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "62202",
      "description": "MANTENIMIENTO Y REHABILITACIÓN DE EDIFICACIONES NO HABITACIONALES"
    }
  ],
  "awards": [
    {
      "id": "C-2025-00071836",
      "internal_reference": "INAH OP RRTSNT 20/2025 - LPN",
      "title": "SEGUNDA ETAPA DE OBRA REESTRUCTURACIÓN. TEMPLO DE SAN NICOLÁS TOLENTINO, PUEBLA",
      "status": "PUBLICADO",
      "contractor": {
        "name": "ARQUITECTO OMAR ROCHA SANCHEZ SA DE CV",
        "normalized_name": "ARQUITECTO OMAR ROCHA SANCHEZ",
        "rfc_type": null,
        "slug": "arquitecto-omar-rocha-sanchez"
      },
      "contract_period": {
        "published_at": "2025-07-16T21:53:30.000Z",
        "starts_at": "2025-07-31T06:00:00.000Z",
        "ends_at": "2025-12-17T06:00:00.000Z"
      },
      "value": {
        "subtotal": "7143372.49",
        "tax": "1142939.6",
        "total": "8286312.09",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62202-0001",
          "description": "SEGUNDA ETAPA DE LA OBRA PARA REESTRUCTURACIÓN, REHABILITACIÓN Y RESARCIMIENTO DE DAÑOS RELACIONADOS CON EL SISMO DEL 19 DE SEPTIEMBRE DE 2017, EN EL TEMPLO DE SAN NICOLÁS TOLENTINO, UBICADO EN LA LOCALIDAD DE SAN NICOLÁS TOLENTINO, MUNICIPIO DE IZÚCAR DE MATAMOROS, EN EL ESTADO DE PUEBLA.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "7143372.49",
          "tax": "1142939.6",
          "other_taxes": null,
          "total": "8286312.09"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "N27Conv TSN PUE.pdf",
      "availability": "available",
      "size_bytes": "62363729",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:28:08.108Z",
      "updated_at": "2025-12-03T10:28:08.109Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "N27 AT TSN PUE.pdf",
      "availability": "available",
      "size_bytes": "111199046",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:25:13.687Z",
      "updated_at": "2025-12-03T10:25:13.688Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "Obra PU 090125.docx",
      "availability": "available",
      "size_bytes": "72210",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:25:15.308Z",
      "updated_at": "2025-12-03T10:25:15.309Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "PLANOS",
      "filename": "N27 Planos.pdf",
      "availability": "available",
      "size_bytes": "29833331",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:26:16.833Z",
      "updated_at": "2025-12-03T10:26:16.834Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "CONSTANCIA DE VISITA",
      "filename": "N27ConstanVisit.pdf",
      "availability": "available",
      "size_bytes": "5157938",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:28:17.636Z",
      "updated_at": "2025-12-03T10:28:17.637Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "N27AclaraTSNPUE.pdf",
      "availability": "available",
      "size_bytes": "8073785",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:28:46.069Z",
      "updated_at": "2025-12-03T10:28:46.070Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "N27ApertTSNTPUE.pdf",
      "availability": "available",
      "size_bytes": "630691",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:28:47.890Z",
      "updated_at": "2025-12-03T10:28:47.892Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "N27FalloTSNPUE.pdf",
      "availability": "available",
      "size_bytes": "1611371",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:28:54.182Z",
      "updated_at": "2025-12-03T10:28:54.183Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-08-03T07:29:24.142Z",
    "last_seen_at": "2026-08-03T08:04:40.094Z",
    "first_seen_at": "2025-11-04T22:01:16.995Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2025-11-04T22:01:16.995Z"
  },
  "context": {
    "suppliers": [
      {
        "slug": "arquitecto-omar-rocha-sanchez",
        "name": "ARQUITECTO OMAR ROCHA SANCHEZ SA DE CV",
        "total_contracts": 36,
        "total_awarded_amount": "259558345.26",
        "median_amount": "5507042.93",
        "distinct_buyers": 2,
        "first_contract_at": "2023-06-28T00:00:00.000Z",
        "last_contract_at": "2026-06-10T00:00:00.000Z",
        "with_this_buyer": {
          "contracts": 32,
          "amount": "238186615.23"
        },
        "refreshed_at": "2026-09-16T00:56:30.797Z"
      }
    ],
    "buyer": {
      "slug": "inah",
      "name": "INSTITUTO NACIONAL DE ANTROPOLOGIA E HISTORIA",
      "total_procedures": 2516,
      "distinct_suppliers": 1259,
      "procedures_by_type": {
        "LICITACIÓN PÚBLICA": 188,
        "ADJUDICACIÓN DIRECTA": 2125,
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 187,
        "CONTRATO ESPECÍFICO DERIVADO DE ACUERDO MARCO": 8,
        "ASIGNACIÓN DIRECTA DE CONTRATO ESPECÍFICO DERIVADO DE ACUERDO MARCO": 8
      },
      "refreshed_at": "2026-09-17T00:44:14.443Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-48-d00-048d00004-n-67-2023",
      "nombre_procedimiento": "OBRA PARA REESTRUCTURACIÓN EN EL TEMPLO DE SAN NICOLÁS TOLENTINO, PUEBLA",
      "dependencia": "INSTITUTO NACIONAL DE ANTROPOLOGIA E HISTORIA",
      "siglas": "INAH",
      "score": 0.06312150515573611,
      "anio_ejercicio": 2023,
      "estatus": "DESIERTO",
      "fecha_fallo": "2023-07-18T11:00:00.000Z",
      "fecha_publicacion": "2023-06-29T09:49:48.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-48-d00-048d00004-n-23-2025",
      "nombre_procedimiento": "SEGUNDA ETAPA PARA LA REESTRUCTURACIÓN EN EL TEMPLO DE LA SANTA CRUZ, PUEBLA",
      "dependencia": "INSTITUTO NACIONAL DE ANTROPOLOGIA E HISTORIA",
      "siglas": "INAH",
      "score": 0.06523739513904447,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-07-18T11:00:00.000Z",
      "fecha_publicacion": "2025-06-10T17:24:02.000Z",
      "ganador": "SISTEMAS INTEGRALES EN CONSTRUCCION QUBA SA DE CV",
      "ganador_slug": "sistemas-integrales-en-construccion-quba",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "5388845.30"
    },
    {
      "numero_procedimiento": "lo-48-d00-048d00004-n-22-2025",
      "nombre_procedimiento": "SEGUNDA ETAPA DE LA OBRA PARA REESTRUCTURACIÓN TEMPLO DE SAN JERÓNIMO, PUEBLA",
      "dependencia": "INSTITUTO NACIONAL DE ANTROPOLOGIA E HISTORIA",
      "siglas": "INAH",
      "score": 0.06536204012405944,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-07-16T11:00:00.000Z",
      "fecha_publicacion": "2025-06-10T17:22:37.000Z",
      "ganador": "INFRAESTRUCTURA Y ARQUITECTURA EN PATRIMONIO HISTÓRICO Y URBANISMO SA DE CV",
      "ganador_slug": "infraestructura-y-arquitectura-en-patrimonio-historico-y-urbanismo",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "6543127.23"
    },
    {
      "numero_procedimiento": "lo-48-d00-048d00004-n-20-2025",
      "nombre_procedimiento": "OBRA PARA REESTRUCTURACIÓN EN EL TEMPLO CONVENTUAL DE SANTA INÉS, PUEBLA",
      "dependencia": "INAH",
      "siglas": "INAH",
      "score": 0.07471615076065063,
      "anio_ejercicio": 2025,
      "estatus": "DESIERTO",
      "fecha_fallo": "2025-07-16T10:00:00.000Z",
      "fecha_publicacion": "2025-06-09T17:28:57.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-48-d00-048d00004-n-37-2025",
      "nombre_procedimiento": "SEGUNDA ETAPA DE OBRA PARA REESTRUCTURACIÓN TEMPLO DE SAN MATEO MIMIAPAN, PUEBLA",
      "dependencia": "INAH",
      "siglas": "INAH",
      "score": 0.07492583543504105,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-08-01T13:00:00.000Z",
      "fecha_publicacion": "2025-06-24T15:54:38.000Z",
      "ganador": "SISTEMAS INTEGRALES EN CONSTRUCCION QUBA SA DE CV",
      "ganador_slug": "sistemas-integrales-en-construccion-quba",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "2884641.21"
    },
    {
      "numero_procedimiento": "lo-48-d00-048d00004-n-67-2025",
      "nombre_procedimiento": "OBRA PARA REESTRUCTURACIÓN EN EL TEMPLO DE LOS SANTOS REYES, COHUECAN, PUEBLA",
      "dependencia": "INAH",
      "siglas": "INAH",
      "score": 0.09122955799102783,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-08-11T13:30:00.000Z",
      "fecha_publicacion": "2025-07-03T14:48:05.000Z",
      "ganador": "CONSTRUCTORES CONACER SA DE CV",
      "ganador_slug": "constructores-conacer",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "8704011.78"
    }
  ]
}