  "html_url": "https://postor.com.mx/licitacion/lo-13-j3b-013j3b002-n-40-2024",
  "canonical": "https://postor.com.mx/licitacion/lo-13-j3b-013j3b002-n-40-2024",
  "id": "7539d39e571c45b2b1196815e7782b83",
  "procedure_number": "LO-13-J3B-013J3B002-N-40-2024",
  "file_number": "E-2024-00052040",
  "title": "REHABILITACION DE CARRETERA ESTATAL ARMERIA - EL PARAISO - CUYUTLAN, COLIMA, PRI",
  "description": {
    "short": null,
    "detailed": "REHABILITACION DE CARRETERA ESTATAL ARMERIA - EL PARAISO - CUYUTLAN, COLIMA, PRIMERA ETAPA, EN CUMPLIMIENTO AL CONVENIO DE COLABORACIÓN CON GOB, ASIPONA MANZANILLO."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "ASIPONA-MANZANILLO",
    "acronym": "ASIPONA-MANZANILLO",
    "branch": "13 - MARINA",
    "buying_unit": "MANZANILLO-GERENCIA DE INGENIERIA",
    "requesting_unit": null,
    "requesting_group": "MANZANILLO-GERENCIA DE INGENIERIA",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "asipona-manzanillo",
    "unit_slug": "manzanillo-gerencia-de-ingenieria-013j3b002"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2024,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "LO-13-J3B-013J3B002-N-40-2024",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2024-05-16T03:34:29.000Z",
    "clarification_meeting_at": "2024-05-23T19:00:00.000Z",
    "clarification_questions_deadline_at": "2024-05-22T19:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2024-06-12T16:00:00.000Z",
    "award_at": "2024-07-11T22:00:00.000Z",
    "estimated_contract_at": "2024-07-18T06:00:00.000Z",
    "site_visit_at": "2024-05-21T18:00:00.000Z",
    "estimated_work_start_at": "2024-07-26T06:00:00.000Z"
  },
  "locations": {
    "state_id": "9",
    "state": "COLIMA",
    "bid_opening": "SALA 1, GERENCIA DE INGENIERÍA, ASIPONA MANZANILLO",
    "award": "SALA 1, GERENCIA DE INGENIERÍA, ASIPONA MANZANILLO",
    "clarification_meeting": "SALA 1, GERENCIA DE INGENIERÍA, ASIPONA MANZANILLO",
    "site_visit": "SALA 1, GERENCIA DE INGENIERÍA, ASIPONA MANZANILLO",
    "work_site": "CARRETERA ESTATAL ARMERIA - EL PARAISO - CUYUTLAN, COLIMA"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "1",
    "supplier_percentage": "10",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "BINARIO",
    "technical_points": null,
    "economic_points": null
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": true,
    "other_insurance_description": "FIANZA DE ANTICIPO",
    "performance_reduction": null
  },
  "participation": {
    "method": "MIXTA",
    "joint": true,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": null,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": true,
    "duration_days": "150",
    "procurement_term": "Normal",
    "subcontracted_work": null,
    "deadline_justification": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "35101-0001",
          "specific_item_code": "35101",
          "cucop_description": "SERVICIOS DE INSTALACION, REPARACION, MANTENIMIENTO Y CONSERVACION MENOR DE INMUEBLES",
          "description": "REHABILITACION DE CARRETERA ESTATAL ARMERIA - EL PARAISO - CUYUTLAN, COLIMA, PRIMERA ETAPA, EN CUMPLIMIENTO AL CONVENIO DE COLABORACIÓN CON GOB, ASIPONA MANZANILLO.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "35101",
          "partida_description": "MANTENIMIENTO Y CONSERVACIÓN DE INMUEBLES PARA LA PRESTACIÓN DE SERVICIOS ADMINISTRATIVOS"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "35101",
      "description": "MANTENIMIENTO Y CONSERVACIÓN DE INMUEBLES PARA LA PRESTACIÓN DE SERVICIOS ADMINISTRATIVOS"
    }
  ],
  "awards": [
    {
      "id": "C-2024-00117844",
      "internal_reference": "ASIPONA-MAN-MOP-37-24",
      "title": "REHABILITACION DE CARRETERA ESTATAL ARMERIA - EL PARAISO - CUYUTLAN, COLIMA, PRI",
      "status": "PUBLICADO",
      "contractor": {
        "name": "CUBER CONSTRUCCIONES SA DE CV",
        "normalized_name": "CUBER CONSTRUCCIONES",
        "rfc_type": null,
        "slug": "cuber-construcciones"
      },
      "contract_period": {
        "published_at": "2026-07-06T18:07:38.000Z",
        "starts_at": "2024-07-26T06:00:00.000Z",
        "ends_at": "2024-12-22T06:00:00.000Z"
      },
      "value": {
        "subtotal": "25307754.95",
        "tax": "4049240.79",
        "total": "29356995.74",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "35101-0001",
          "description": "REHABILITACION DE CARRETERA ESTATAL ARMERIA - EL PARAISO - CUYUTLAN, COLIMA, PRIMERA ETAPA, EN CUMPLIMIENTO AL CONVENIO DE COLABORACIÓN CON GOB, ASIPONA MANZANILLO.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "25307754.95",
          "tax": "4049240.79",
          "other_taxes": null,
          "total": "29356995.74",
          "cucop_description": "SERVICIOS DE INSTALACION, REPARACION, MANTENIMIENTO Y CONSERVACION MENOR DE INMUEBLES",
          "partida_code": "35101",
          "partida_description": "MANTENIMIENTO Y CONSERVACIÓN DE INMUEBLES PARA LA PRESTACIÓN DE SERVICIOS ADMINISTRATIVOS"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "01.- Convocatoria LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "813665",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:11:48.478Z",
      "updated_at": "2025-12-13T10:11:48.479Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FECHA Y HORA DE APERTURA DE PROPOSICIONES",
      "filename": "COMUNICADO A LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "903440",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:39.328Z",
      "updated_at": "2025-12-13T10:12:39.329Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FECHA Y HORA DE APERTURA DE PROPOSICIONES",
      "filename": "COMUNICADO B LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "1961673",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:41.606Z",
      "updated_at": "2025-12-13T10:12:41.608Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "COMUNICADO C LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "316711",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:55.862Z",
      "updated_at": "2025-12-13T10:12:55.863Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "COMUNICADO D LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "316717",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:57.945Z",
      "updated_at": "2025-12-13T10:12:57.946Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "COMUNICADO E LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "318869",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:59.245Z",
      "updated_at": "2025-12-13T10:12:59.246Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "02.- Anexos LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "2059252",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:11:50.863Z",
      "updated_at": "2025-12-13T10:11:50.864Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "03.- Modelo de Contrato y Fianzas.pdf",
      "availability": "available",
      "size_bytes": "1114671",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:11:53.790Z",
      "updated_at": "2025-12-13T10:11:53.791Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "CATALOGO Y ESPECIFICACIONES",
      "filename": "04.- Catalogo y Especificaciones LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "33741017",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:21.704Z",
      "updated_at": "2025-12-13T10:12:21.705Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "PLANOS",
      "filename": "05.- Planos.pdf",
      "availability": "available",
      "size_bytes": "4972242",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:27.496Z",
      "updated_at": "2025-12-13T10:12:27.497Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "Acta Junta de Aclaraciones LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "1558992",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:31.306Z",
      "updated_at": "2025-12-13T10:12:31.307Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "Acta de Visita LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "833451",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:36.677Z",
      "updated_at": "2025-12-13T10:12:36.678Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "Acta de Presentacion y Apertura LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "11650294",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:12:54.500Z",
      "updated_at": "2025-12-13T10:12:54.501Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "Acta de Fallo LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "2217996",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:13:08.043Z",
      "updated_at": "2025-12-13T10:13:08.044Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ANEXOS ACTA DE FALLO",
      "filename": "Fallo LO-13-J3B-013J3B002-N-40-2024.pdf",
      "availability": "available",
      "size_bytes": "13369562",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-13T10:13:18.281Z",
      "updated_at": "2025-12-13T10:13:18.282Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-07-31T16:39:14.294Z",
    "last_seen_at": "2026-07-31T19:39:24.775Z",
    "first_seen_at": "2025-11-05T07:08:27.677Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2025-11-05T07:08:27.677Z"
  },
  "context": {
    "suppliers": [
      {
        "slug": "cuber-construcciones",
        "name": "CUBER CONSTRUCCIONES SA DE CV",
        "total_contracts": 10,
        "total_awarded_amount": "173173010.20",
        "median_amount": "9434607.26",
        "distinct_buyers": 4,
        "first_contract_at": "2023-03-24T00:00:00.000Z",
        "last_contract_at": "2026-05-02T00:00:00.000Z",
        "with_this_buyer": {
          "contracts": 3,
          "amount": "62967356.33"
        },
        "refreshed_at": "2026-09-16T00:56:30.797Z"
      }
    ],
    "buyer": {
      "slug": "asipona-manzanillo",
      "name": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL MANZANILLO, S.A. DE C.V.",
      "total_procedures": 860,
      "distinct_suppliers": 314,
      "procedures_by_type": {
        "LICITACIÓN PÚBLICA": 261,
        "ADJUDICACIÓN DIRECTA": 470,
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 129
      },
      "refreshed_at": "2026-09-22T04:30:03.342Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-13-j3b-013j3b002-n-64-2024",
      "nombre_procedimiento": "MANTENIMIENTO MEDIANTE PAVIMENTACIÓN DE CARRETERA MINATITLÁN.",
      "dependencia": "ASIPONA-MANZANILLO",
      "siglas": "ASIPONA-MANZANILLO",
      "score": 0.09218251705169678,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-12-23T17:30:00.000Z",
      "fecha_publicacion": "2024-11-28T23:19:39.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "lo-13-j3b-013j3b002-n-18-2024",
      "nombre_procedimiento": "ELABORACIÓN DE PROYECTO PARA LA REHABILITACION DE CARREtErA ESTATAL",
      "dependencia": "ASIPONA-MANZANILLO",
      "siglas": "ASIPONA-MANZANILLO",
      "score": 0.10524952411651611,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-03-26T16:00:00.000Z",
      "fecha_publicacion": "2024-02-15T22:39:46.000Z",
      "ganador": "LABORATORIO DE MATERIALES SA DE CV",
      "ganador_slug": "laboratorio-de-materiales",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "1429998.91"
    },
    {
      "numero_procedimiento": "lo-13-j3b-013j3b002-n-31-2024",
      "nombre_procedimiento": "MANTENIMIENTO MEDIANTE PAVIMENTACIÓN DE CONCRETO HIDRAULICO DEL ACCESO MANZANILL",
      "dependencia": "ASIPONA-MANZANILLO",
      "siglas": "ASIPONA-MANZANILLO",
      "score": 0.10536377994037827,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-06-26T17:00:00.000Z",
      "fecha_publicacion": "2024-05-07T22:02:33.000Z",
      "ganador": "INGENIERIA Y CONSTRUCCION DE OBRA CIVIL Y ELECTRICA SA DE CV",
      "ganador_slug": "ingenieria-y-construccion-de-obra-civil-y-electrica",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "9666713.13"
    },
    {
      "numero_procedimiento": "lo-13-j3b-013j3b002-n-25-2023",
      "nombre_procedimiento": "REHABILITACION DEL MALECON MIRAMAR, PRIMERA ETAPA, ASIPONA MANZANILLO.",
      "dependencia": "ASIPONA-MANZANILLO",
      "siglas": "ASIPONA-MANZANILLO",
      "score": 0.11989116668701172,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-11-07T16:00:00.000Z",
      "fecha_publicacion": "2023-10-02T19:51:37.000Z",
      "ganador": "CONSTRUCTORA SACOSTA SA DE CV",
      "ganador_slug": "constructora-sacosta",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "37446882.82"
    },
    {
      "numero_procedimiento": "lo-13-j3b-013j3b002-n-42-2024",
      "nombre_procedimiento": "MANTENIMIENTO MEDIANTE BACHEO A VIALIDADES INTERNAS Y EN ZONA DE DESARROLLO PORT",
      "dependencia": "ASIPONA-MANZANILLO",
      "siglas": "ASIPONA-MANZANILLO",
      "score": 0.1254364922902862,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-07-08T16:00:00.000Z",
      "fecha_publicacion": "2024-05-16T20:49:14.000Z",
      "ganador": "GACSA CONSTRUCCIONES SA DE CV",
      "ganador_slug": "gacsa-construcciones",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "9245135.60"
    },
    {
      "numero_procedimiento": "lo-13-j3b-013j3b002-n-32-2024",
      "nombre_procedimiento": "REHABILITACIÓN DE LA INFRAESTRUCTURA DEL CAMPUS EDUCATIVO SAN PEDRITO PRIMERA ET",
      "dependencia": "ASIPONA-MANZANILLO",
      "siglas": "ASIPONA-MANZANILLO",
      "score": 0.12626845397164987,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-07-01T13:00:00.000Z",
      "fecha_publicacion": "2024-05-07T22:03:04.000Z",
      "ganador": "WYVERN INGENIERIA Y CONSTRUCCION SA DE CV",
      "ganador_slug": "wyvern-ingenieria-y-construccion",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "20680664.58"
    }
  ]
}