  "html_url": "https://postor.com.mx/licitacion/lo-13-j3a-013j3a002-n-17-2025/partidas/1",
  "canonical": "https://postor.com.mx/licitacion/lo-13-j3a-013j3a002-n-17-2025/partidas/1",
  "procedure_number": "LO-13-J3A-013J3A002-N-17-2025",
  "title": "CONSTRUCCIÓN DE VIALIDAD C EN ISLA LA PALMA DEL PUERTO DE LÁZARO CÁRDENAS, MICH.",
  "collection": "partidas",
  "awarded": false,
  "note": "Esta página contiene únicamente las partidas solicitadas indicadas; sigue los enlaces para recorrer la colección completa.",
  "page_info": {
    "page": 1,
    "page_size": 50,
    "total": 175,
    "total_pages": 4,
    "returned": 50,
    "offset": 0,
    "has_more": true,
    "complete": false
  },
  "links": {
    "self": "https://postor.com.mx/licitacion/lo-13-j3a-013j3a002-n-17-2025/partidas/1.json",
    "previous": null,
    "next": "https://postor.com.mx/licitacion/lo-13-j3a-013j3a002-n-17-2025/partidas/2.json",
    "procedure": "https://postor.com.mx/licitacion/lo-13-j3a-013j3a002-n-17-2025",
    "full_json": "https://postor.com.mx/licitacion/lo-13-j3a-013j3a002-n-17-2025.json",
    "line_items": "https://postor.com.mx/licitacion/lo-13-j3a-013j3a002-n-17-2025/partidas/1.json"
  },
  "data": [
    {
      "number": "1",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "TALA  Y DESENRAICE DE ÁRBOL DE HASTA 12 METROS DE ALTURA CON DIÁMETRO DE TRONCO DE HASTA 2.00 METROS Y RAÍCES EXTENDIDAS EN UN RADIO DE HASTA 8.00 METROS CON PROFUNDIDADES DE HASTA 4.00 METROS, INCLUYE: CORTE DE RAMAS EN TRAMOS DE 50 CMS DE LONGITUD, CORTE DE TRONCO EN TRAMOS DE 50 CMS DE LONGITUD, CARGA Y RETIRO DE MATERIAL VEGETAL HASTA UNA DISTANCIA MÁXIMA DE 2.00 KILÓMETROS EN CAMIÓN VOLTEO, DESCARGA Y BANDEADO DEL MATERIAL EN ZONA DE DEPÓSITO, MANO DE OBRA, EQUIPO, MAQUINARIA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCIÓN DE LOS TRABAJOS, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "2",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "TRAZO Y NIVELACIÓN DE TERRENO ESTABLECIENDO REFERENCIAS TOPOGRÁFICAS PARA DESPLANTE DE ESTRUCTURAS INCLUYE: CARGO DIRECTO POR EL COSTO DE LOS MATERIALES Y MANO DE OBRA QUE INTERVENGAN, LOCALIZACIÓN GENERAL, LOCALIZACIÓN DE ENTRE EJES, SEÑALAMIENTOS, ESTACADO, BANCOS DE NIVEL, MOJONERAS, LIMPIEZA Y RETIRO DE SOBRANTES FUERA DE OBRA AL BANCO DE DESPERDICIO INDICADO POR SUPERVISIÓN, EQUIPO DE SEGURIDAD, INSTALACIONES ESPECÍFICAS, DEPRECIACIÓN Y DEMÁS DERIVADOS DEL USO DE HERRAMIENTA Y EQUIPO. A EJES EN DESPLANTE DE CONSTRUCCIÓN,  P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "3",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "COMPACTACIÓN DEL TERRENO NATURAL Y/O CAMA DE LOS CORTES, EN CAPAS NO MAYORES DE 20 CM, CON RODILLO VIBRATORIO DE 10 TON. O BAILARINA SEGÚN SEA EL CASO, CAPACIDAD DE ACUERDO A PROYECTO PARA ALCANZAR EL GRADO DE COMPACTACIÓN AL 95% DESEADO DE SU PVSM, INCLUYE AGUA, MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "4",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "EXCAVACIONES CON MAQUINARIA EXCAVADORA SOBRE ORUGAS EN CORTES Y ADICIONALES ABAJO DE LA SUBRASANTE EN MATERIAL TIPO \"B\", INCLUYE : APILE DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES, MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "5",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CARGA CON MAQUINARIA CARGADOR FRONTAL MONTADO SOBRE NEUMÁTICOS DE LOS MATERIALES ALMACENADOS APROVECHABLES Y DE DESPERDICIO PRODUCTO DE  MATERIAL DE DESPALME, CORTES, EXCAVACIONES Y/O DEMOLICIONES (VOLUMEN MEDIDO SUELTO), INCLUYE: ACARREO EN CAMIÓN VOLTEO AL PRIMER KILÓMETRO, MANO OBRA, MAQUINARIA Y EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "6",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "ACARREOS PARA TERRACERÍAS Y PAVIMENTOS DE LOS MATERIALES DE PRÉSTAMO DE BANCO O ALMACENADOS PARA LA CONSTRUCCIÓN DE LOS TERRAPLENES, DE LA CAPA SUBRASANTE  Y BASES (VOLUMEN MEDIDO COMPACTO), PARA LOS KILÓMETROS SUBSECUENTES AL PRIMER KILÓMETRO, DEL KM. 2 AL KM. 8 RECORRIDO SOBRE TERRACERÍAS O PAVIMENTOS EN CAMINO PLANO, INCLUYE : MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "7",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "FORMACION Y COMPACTACION DE TERRAPLENES ADICIONADOS CON SUS CUÑAS DE SOBREANCHO PARA EL NOVENTA Y CINCO POR CIENTO (95%), CON RODILLO LISO DE 10 TON. INCLUYE : ACAMELLONADO, MEZCLADO, TENDIDO, CONFORMACION Y NIVELADO, SUMINISTRO DEL AGUA EMPLEADA EN LA COMPACTACION, MANO OBRA, MAQUINARIA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "8",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "EXCAVACION, EXTRACCION Y CARGA CON MAQUINARIA CARGADOR FRONTAL MONTADO SOBRE NEUMATICOS PARA LOS PRESTAMOS DE BANCO DE MATERIAL GRAVA-ARENA TIPO \"B\", ASIPONA SUMINISTRA MATERIAL PETREO DEL BANCO \"NORTE\" UBICADO A 8.00 KM. DESVIACION IZQUIERDA DEL KM. 0+000 DEL INICIO DE LA OBRA, INCLUYE: CARGA A LOS VEHICULOS DE TRANSPORTE DE LOS MATERIALES DE LOS PRESTAMOS BANCO EN EL LUGAR DE LA EXTRACCION, MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "9",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "ACARREOS PARA TERRACERIAS DE LOS MATERIALES DE PRESTAMO DE BANCO O ALMACENADOS PARA LA CONFORMACION Y COMPACTACION DE TERRENO (VOLUMEN MEDIDO COMPACTO), PARA EL PRIMER KILOMETRO RECORRIDO SOBRE TERRACERIAS O PAVIMENTOS EN CAMINO PLANO, INCLUYE : MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "10",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "ACARREOS PARA TERRACERIAS DE LOS MATERIALES DE PRESTAMO DE BANCO O ALMACENADOS PARA LA CONFORMACION Y COMPACTACION DE TERRENO (VOLUMEN MEDIDO COMPACTO), PARA KILOMETROS SUBSECUENTES RECORRIDO SOBRE TERRACERIAS O PAVIMENTOS EN CAMINO PLANO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "11",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "OPERACION DE MEZCLADO, TENDIDO, COMPACTACION Y AFINADO EN LA CONSTRUCCION DE SUB-BASES CUANDO SE EMPLEE UN (1) MATERIAL PETREO, COMPACTADO AL CIEN POR CIENTO (100%),  INCLUYE : SUMINISTRO DEL AGUA EMPLEADA EN LA COMPACTACION, MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "12",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "OPERACION DE MEZCLADO, TENDIDO, COMPACTACION Y AFINADO EN LA CONSTRUCCION DE BASES CUANDO SE EMPLEE UN (1) MATERIAL PETREO, COMPACTADO AL CIEN POR CIENTO (100%),  INCLUYE: SUMINISTRO DEL AGUA EMPLEADA EN LA COMPACTACION, MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "13",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "FORMACION DE ESCALONES DE LIGA EN EL CUERPO DE LOS PAVIMENTOS EXISTENTES (CARPETA ASFALTICA, BASES Y SUB-BASES), PARA LA UNION CON EL NUEVO CUERPO DE LOS PAVIMENTOS, CONSIDERANDO POR CAPA UN ANCHO DE ESCALON DE LIGA, COMO LA DISTANCIA QUE RESULTE IGUAL A LA SUMA DEL DOBLE DEL ESPESOR DE LA CAPA QUE SE PRETENDA UNIR, HASTA FORMAR UN ANCHO TOTAL DE 86 CM., EN UNA ROFUNDIDAD CONSIDERANDO HASTA EL NIVEL INFERIOR DE LA CAPA QUE SE TRATE UNIR, INCLUYE: COMPACTACION AL CIEN POR CIENTO (100%), MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "14",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "BARRIDO DE LA SUPERFICIE DE LA BASE POR TRATAR POR MEDIOS MECANICOS, INCLUYE : MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "15",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO Y APLICACIÓN DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA CATIONICA DE ROMPIMIENTO MEDIO EN PROPORCION DE 1.50 LT/M² PARA LA PROTECCION DE LA BASE, INCLUYE: MATERIALES, MANO OBRA, HERRAMIENTA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "16",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO Y APLICACIÓN DE RIEGO DE LIGA CON EMULSION ASFALTICA CATIONICA DE ROMPIMIENTO RAPIDO EN PROPORCION DE 1.20 LT/M² PARA RECIBIR CARPETA ASFALTICA, INCLUYE : MATERIALES, MANO OBRA, HERRAMIENTA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "17",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "ELABORACION DE CARPETA DE CONCRETO ASFALTICO EN CALIENTE CON CEMENTO ASFALTICO MODIFICADO CON POLIMERO INTEGRADO GRADO PG 64-22 Y AGREGADO PETREO TRITURADO DE 3/4\" A FINOS DEL BANCO QUE ELIJA EL CONTRATISTA (VOLUMEN MEDIDO COMPACTO), DOSIFICACION DEL CEMENTO ASFALTICO DE 125 KG POR METRO CUBICO DE MATERIAL SUELTO , INCLUYE : CARGA DE LA CARPETA ASFALTICA CON MAQUINARIA CARGADOR FRONTAL MONTADO SOBRE NEUMATICOS A LOS VEHICULOS DE TRANSPORTE, MATERIALES, MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA ELABORACION, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "18",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "ACARREOS PARA PAVIMENTOS DE LOS MATERIALES ALMACENADOS EN PLANTA, PARA LA CONSTRUCCION DE LAS CARPETAS DE CONCRETO ASFALTICO EN CALIENTE (VOLUMEN MEDIDO COMPACTO), PARA EL PRIMER KILOMETRO RECORRIDO SOBRE TERRACERIAS O PAVIMENTOS EN CAMINO PLANO, INCLUYE : MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "19",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "ACARREOS PARA PAVIMENTOS DE LOS MATERIALES ALMACENADOS EN PLANTA, PARA LA CONSTRUCCION DE LAS CARPETAS DE CONCRETO ASFALTICO EN CALIENTE (VOLUMEN MEDIDO COMPACTO), PARA LOS KILOMETROS SUBSECUENTES AL PRIMER KILOMETRO, DEL KM. 2 AL KM. 3 RECORRIDO SOBRE TERRACERIAS O PAVIMENTOS EN CAMINO PLANO, INCLUYE : MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "20",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "TENDIDO CON EXTENDEDORA Y COMPACTADO DE CARPETA DE CONCRETO ASFALTICO EN CALIENTE, COMPACTACION AL CIEN POR CIENTO (100%) DE LA PRUEBA V.R.S.,  INCLUYE : RECORTES Y CHAFLANES, MANO OBRA, HERRAMIENTA, MAQUINARIA Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCION, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "21",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "RELLENO Y COMPACTACIÓN CON EQUIPO MECÁNICO TIPO BAILARINA EN ÁREA DE BANQUETAS AL 95% PROCTOR CON MATERIAL PRODUCTO DE EXCAVACIÓN DE ACUERDO A PROYECTO, EN CAPAS NO MAYORES DE 20 CM., INCLUYE: COMPACTACIÓN, INCORPORACIÓN DE AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO. P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "22",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN DE GUARNICIONES DE CONCRETO HIDRÁULICO HECHO EN OBRA DE F'C=200 KG/CM² CON SECCIÓN GEOMÉTRICA RECTA DE 15 CM. DE CORONA X 50 CM. DE ALTURA, ARMADO CON ARMEX DE 10 X 20-4, INCLUYE : EXCAVACIÓN EN ZANJA CON HERRAMIENTA MANUAL EN MATERIAL TIPO \"B\" HASTA 50 CM. DE PROFUNDIDAD, AFINE DEL FONDO DE LA EXCAVACIÓN, HABILITADO Y COLOCACIÓN DE LA CIMBRA METÁLICA, ELABORACIÓN, ACARREOS CON BOTES O CARRETILLA HASTA 50 M. DE DISTANCIA, VACIADO Y VIBRADO DEL CONCRETO, ACABADO CON VOLTEADOR, APLICACIÓN DE MEMBRANA DE CURADO COLOR BLANCO CURAFEST DE FESTER Y DESCIMBRADOS, RELLENO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN COMPACTADO AL 95% DE SU PVSM. INCLUYE : MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "23",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN DE BANQUETA DE CONCRETO PREMEZCLADO F’C= 150 KG/CM² DE 8 CMS. DE ESPESOR ARMADO CON MALLA ELECTROSOLDADA 6X6-6/6 Y ACABADO, ESCOBILLADO Y PERIMETRO AFINADO CON VOLTEADOR  EN LOSAS DE 1.20X1.00 M. O EL INDICADO EN PROYECTO, INCLUYE: AFINE DE TERRENO PARA RECIBIR BANQUETA, MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "24",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "TRAZO Y NIVELACIÓN DE TERRENO ESTABLECIENDO REFERENCIAS TOPOGRÁFICAS PARA DESPLANTE DE ESTRUCTURAS INCLUYE: CARGO DIRECTO POR EL COSTO DE LOS MATERIALES Y MANO DE OBRA QUE INTERVENGAN, LOCALIZACIÓN GENERAL, LOCALIZACIÓN DE ENTRE EJES, SEÑALAMIENTOS, ESTACADO, BANCOS DE NIVEL, MOJONERAS, LIMPIEZA Y RETIRO DE SOBRANTES FUERA DE OBRA AL BANCO DE DESPERDICIO INDICADO POR SUPERVISIÓN, EQUIPO DE SEGURIDAD, INSTALACIONES ESPECÍFICAS, DEPRECIACIÓN Y DEMÁS DERIVADOS DEL USO DE HERRAMIENTA Y EQUIPO. A EJES EN DESPLANTE DE CONSTRUCCIÓN,  P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "25",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CORTE DE CARPETA ASFÁLTICA DE 8 A 12 CMS DE ESPESOR, CON MAQUINA CORTADORA Y DISCO CON PUNTA DE DIAMANTE, INCLUYE : TRAZO Y ALINEACIÓN DE LA TRAYECTORIA DEL CORTE, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "26",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "DEMOLICIÓN CON HERRAMIENTA MANUAL Y/O MECÁNICA DE CONCRETO ASFALTO EN UN ESPESR DE HASTA 12 CMS.,  INCLUYE : RECORTES DE LOS MATERIALES SOBRANTES Y APILE DEL MATERIAL EN EL LUGAR DE LA DEMOLICIÓN, RETIRO DE MATERIAL SOBRANTE PRODUCTO DE LA DEMOLICIÓN, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "27",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CARGA Y ACARREO DE MATERIAL PRODUCTO DE LA RUPTURA Y DEMOLICIÓN DE CONCRETO ASFALTICO ; INCLUYE CARGA Y ACARREO AL PRIMER KILOMETRO  EN CAMIÓN CERRADO CON LONA EN LA PARTE SUPERIOR PARA EVITAR DERRAMES MANO DE OBRA Y EQUIPOS P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "28",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "ACARREO EN CAMION VOLTEO DE LOS MATERIALES MIXTOS DE DESPERDICIO PRODUCTO DE LAS  DEMOLICIONES (VOLUMEN MEDIDO SUELTO) PARA LOS KILOMETROS SUBSECUENTES AL PRIMER KILOMETRO,FUERA DEL RECINTO PORTUARIO. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y DEMÁS CARGOS CORRESPONDIENTES, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "29",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "EXCAVACION DE ZANJA EN UN ANCHO DE HASTA 2.30 METROS CON MAQUINARIA RETROEXCAVADORA EN MATERIAL TIPO \"B\" Y HASTA 4.00 M. DE PROFUNDIDAD (VOLUMEN MEDIDO EN BANCO), INCLUYE : AFINE Y COMPACTACION SIN CONTROL DE LABORATORIO CON BAILARINA DEL FONDO DE LA CEPA, MAQUINARIA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "30",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO, INSTALACION Y PRUEBA DE TUBERÍA  HDPE CORRUGADO DE POLIETILENO DE ALTA DENSIDAD, PARA ALCANTARILLADO SANITARIO CON ANILLO HIDRÁULICO DE 30 CM (12”) Ø, INCLUYE: CAMA DE ARENA DE 10 CMS DE ESPESOR,  UNION ENTRE TUBERIAS, UNION DE REGISTRO  CON TUBERIA DE PROYECTO, EMBOQUILLADO, ALMACENAMIENTO MANIOBRAS LOCALES, FLETES, ACARREOS Y TODOS LOS CARGOS CORRESPONDIENTES, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "31",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO, INSTALACION Y PRUEBA DE TUBERÍA  HDPE CORRUGADO DE POLIETILENO DE ALTA DENSIDAD, PARA ALCANTARILLADO SANITARIO CON ANILLO HIDRÁULICO DE 105 CM (42”) Ø,  INCLUYE: CAMA DE ARENA DE 10 CMS DE ESPESOR,  UNION ENTRE TUBERIAS, UNION DE REGISTRO  CON TUBERIA DE PROYECTO, EMBOQUILLADO, ALMACENAMIENTO MANIOBRAS LOCALES, FLETES, ACARREOS Y TODOS LOS CARGOS CORRESPONDIENTES, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "32",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO, INSTALACION Y PRUEBA DE TUBERÍA  HDPE CORRUGADO DE POLIETILENO DE ALTA DENSIDAD, PARA ALCANTARILLADO SANITARIO CON ANILLO HIDRÁULICO DE 120 CM (48”) Ø,  INCLUYE: CAMA DE ARENA DE 10 CMS DE ESPESOR,  UNION ENTRE TUBERIAS, UNION DE REGISTRO  CON TUBERIA DE PROYECTO, EMBOQUILLADO, ALMACENAMIENTO MANIOBRAS LOCALES, FLETES, ACARREOS Y TODOS LOS CARGOS CORRESPONDIENTES, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "33",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "RELLENO CON HERRAMIENTA MACANICA CON MATERIAL PRODUCTO DE EXCAVACION EN CAPAS NO MAYORES DE 20 CMS DE ESPESOR ACOSTILLANDO LA TUBERIA Y COMPACTANDO CON BAILARINA AL 95% DE SU PVSM CON MATERIAL PRODUCTO DE LA EXCAVACION , INCLUYE : SUMINISTRO DEL AGUA EMPLEADA EN LA COMPACTACION, MANO OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "34",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN Y COLOCACIÓN DE REGISTRO POZO PLUVIAL DE CONCRETO ARMADO DE 2.05 X 2.50M DE LADO CON ALTURA DE 2.00 M. A 2.20 M., DIMENSIONES EXTERIORES,  MUROS Y LOSAS DE 20 CMS DE ESPESOR, ACERO DE REFUERZO F'Y=4200 KG/CM2 DEL NÚMERO 4 (1/2\") DIÁMETRO A CADA 20 CMS DE SEPARACIÓN EN AMBOS SENTIDOS Y A DOBLE PARRILLA, CONCRETO F'C=250 KG/CM2 , PREPARACIÓN DE ORIFICIOS PARA TUBERÍA DE PROYECTO DE ACUERDO AL DIÁMETRO INDICADO, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "35",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN Y COLOCACIÓN DE REGISTRO POZO PLUVIAL DE CONCRETO ARMADO DE 2.05 X 2.50M DE LADO CON ALTURA DE 2.21 M. A 2.50 M., DIMENSIONES EXTERIORES,  MUROS Y LOSAS DE 20 CMS DE ESPESOR, ACERO DE REFUERZO F'Y=4200 KG/CM2 DEL NÚMERO 4 (1/2\") DIÁMETRO A CADA 20 CMS DE SEPARACIÓN EN AMBOS SENTIDOS Y A DOBLE PARRILLA, CONCRETO F'C=250 KG/CM2 , PREPARACIÓN DE ORIFICIOS PARA TUBERÍA DE PROYECTO DE ACUERDO AL DIÁMETRO INDICADO, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "36",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN Y COLOCACIÓN DE REGISTRO POZO PLUVIAL DE CONCRETO ARMADO DE 2.05 X 2.50M DE LADO CON ALTURA DE 2.51 M. A 2.80 M., DIMENSIONES EXTERIORES,  MUROS Y LOSAS DE 20 CMS DE ESPESOR, ACERO DE REFUERZO F'Y=4200 KG/CM2 DEL NÚMERO 4 (1/2\") DIÁMETRO A CADA 20 CMS DE SEPARACIÓN EN AMBOS SENTIDOS Y A DOBLE PARRILLA, CONCRETO F'C=250 KG/CM2 , PREPARACIÓN DE ORIFICIOS PARA TUBERÍA DE PROYECTO DE ACUERDO AL DIÁMETRO INDICADO, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "37",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN Y COLOCACIÓN DE REGISTRO POZO PLUVIAL DE CONCRETO ARMADO DE 2.05 X 2.50M DE LADO CON ALTURA DE 2.81 M. A 3.10 M., DIMENSIONES EXTERIORES,  MUROS Y LOSAS DE 20 CMS DE ESPESOR, ACERO DE REFUERZO F'Y=4200 KG/CM2 DEL NÚMERO 4 (1/2\") DIÁMETRO A CADA 20 CMS DE SEPARACIÓN EN AMBOS SENTIDOS Y A DOBLE PARRILLA, CONCRETO F'C=250 KG/CM2 , PREPARACIÓN DE ORIFICIOS PARA TUBERÍA DE PROYECTO DE ACUERDO AL DIÁMETRO INDICADO, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "38",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN Y COLOCACIÓN DE REGISTRO POZO PLUVIAL DE CONCRETO ARMADO DE 2.05 X 2.50M DE LADO CON ALTURA DE 3.11 M. A 3.50 M., DIMENSIONES EXTERIORES,  MUROS Y LOSAS DE 20 CMS DE ESPESOR, ACERO DE REFUERZO F'Y=4200 KG/CM2 DEL NÚMERO 4 (1/2\") DIÁMETRO A CADA 20 CMS DE SEPARACIÓN EN AMBOS SENTIDOS Y A DOBLE PARRILLA, CONCRETO F'C=250 KG/CM2 , PREPARACIÓN DE ORIFICIOS PARA TUBERÍA DE PROYECTO DE ACUERDO AL DIÁMETRO INDICADO, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "39",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN Y COLOCACIÓN DE REGISTRO POZO PLUVIAL DE CONCRETO ARMADO DE 2.05 X 2.50M DE LADO CON ALTURA DE 3.51 M. A 3.85 M., DIMENSIONES EXTERIORES,  MUROS Y LOSAS DE 20 CMS DE ESPESOR, ACERO DE REFUERZO F'Y=4200 KG/CM2 DEL NÚMERO 4 (1/2\") DIÁMETRO A CADA 20 CMS DE SEPARACIÓN EN AMBOS SENTIDOS Y A DOBLE PARRILLA, CONCRETO F'C=250 KG/CM2 , PREPARACIÓN DE ORIFICIOS PARA TUBERÍA DE PROYECTO DE ACUERDO AL DIÁMETRO INDICADO, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "40",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO E INSTALACION DE REJILLA TIPO IRVING DE 2 1/2\" X 1/4\" ESPESOR PARA TRAFICO PESADO DE 0.985 X 1.34 MTS DE DIMENSIONES, INCLUYE MARCO A BASE DE ANGULO DE 3\" X3\" Y ANCLAS EN LAS CUATRO ESQUINAS A BASE DE SOLERA DE 2\" X1/4\" DE 1.00 X 1.30 MTS, HABILITADO DE ACERO ESTRUCTURAL, SOLDADURA,  MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "41",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN Y COLOCACIÓN DE REGISTRO PARA ALCANTARILLA DE CONCRETO ARMADO DE 1.10M DE LARGO  X 0.80M. DE ANCHO X 0.95 M. DE ALTURA, DIMENSIONES EXTERIORES,  MUROS Y LOSAS DE 10 CMS DE ESPESOR, ACERO DE REFUERZO F'Y=4200 KG/CM2 DEL NÚMERO 3 (3/8\") DE DIÁMETRO A CADA 15 CMS DE SEPARACIÓN EN AMBOS SENTIDOS A UNA PARRILLA, CONCRETO F'C=250 KG/CM2 , PREPARACIÓN DE ORIFICIOS PARA TUBERÍA DE PROYECTO DE ACUERDO AL DIÁMETRO INDICADO, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "42",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO E INSTALACION DE REJILLA Y BROCAL DE POLIETILENO DE ALTA DESNDIDAD PARA PASO DE TRAFICO PESADO DE 30 X 90CMS MEDIDAS DE REJILLA, 42.7 X 106.8 CMS X 15 CMS DE ALTURA DE BROCAL, PARA INSTALAR EN  BOCA DE TORMENTA DETALLE DE PROYECTO,  INCLUYE: ACARREOS, ALMACENAMIENTO, MANIOBRAS LOCALES, FLETES,  ANCLAJE A PARTE SUPERIOR DE REGISTRO O BOCA DE TORMENTA PLUVIAL, MANO DE OBRA, HERRAMIENTA Y TODOS LOS CARGOS CORRESPONDIENTES, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "43",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CONSTRUCCIÓN DE DESCARGA PLUVIAL PARA TUBERÍA DE 48\" DE DIÁMETRO DE 4.55 X 3.78 X 2.57 M DE ALTURA, CONCRETO ARMADO CON ACERO DE REFUERZO F'Y=4200 KG/CM2, DEL NÚMERO 4, (1/4\") A CADA 20 CM. DE SEPARACIÓN EN AMBOS SENTIDOS A 1 PARRILLA, CONCRETO F/C=200 KG/CM2, MUROS DE 35 CMS DE ESPESOR, PREPARACIÓN DE ORIFICIO DE ACUERDO A DIÁMETRO DE TUBERÍA A CONECTAR, PLANTILLA DE CONCRETO F'C=100KG/CM DE 5 CMS DE ESPESOR, INCLUYE : EXCAVACIÓN DE LA CEPA EN MATERIAL TIPO B, CIMBRADOS Y DESCIMBRADOS, ELABORACIÓN Y VACIADO DEL CONCRETO, RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "44",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "EXCAVACIONES EN ZANJA POR MEDIO DE RETROEXCAVADORA EN MATERIAL TIPO \"A\" HASTA 2.50 M. DE PROFUNDIDAD (VOLUMEN SUELTO), INCLUYE : AFINE DE TALUDES Y FONDO, ASI COMO EL COMPENSADO, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "45",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "COMPACTACIÓN DEL TERRENO EN  AREA DE DESPLANTE  EN UN ESPESOR DE 10 CMS, CON RODILLOS VIBRATORIOS, COMPACTADORES DOBLES, DE CONDUCCIÓN MANUAL MOTOR A DIÉSEL, CAPACIDAD DE 1 TON. PARA ALCANZAR EL GRADO DE COMPACTACIÓN AL NOVENTA POR CIENTO (90 %) DE SU P.V.S.M. PRUEBA AASTHO, INCLUYE: INCORPORACION DE AGUA EMPLEADA EN LA COMPACTACION, EQUIPO, HERRAMIENTA Y MANO DE OBRA NECESARIA PARA LA CORRECTA EJECUCIÓN DE LOS TRABAJOS P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "46",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "FABRICACIÓN DE PLANTILLA DE CONCRETO DE F´C=100 KG/CM2, DE 5 CM DE ESPESOR PARA DESPLANTE DE ELEMENTOS ESTRUCTURALES DE CIMENTACIÓN, HECHO EN OBRA CON AGREGADO DE 19MM. INCLUYE SUMINISTRO DE TODOS LOS MATERIALES, FABRICACIÓN Y VACIADO, VIBRADO, CURADO, LIMPIEZA Y ARREGLO DEL ÁREA AL FINAL DEL COLADO, EQUIPO, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCIÓN DE LOS TRABAJOS, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "47",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO, HABILITADO Y COLOCACION DE ACERO DE REFUERZO  (NUM. 4) (1/2\" Ø) DE ALTA RESISTENCIA DE FY=4200 KG/CM², INCLUYE : ALAMBRE PARA AMARRE, TRASLAPES, DOBLECES, GANCHOS Y DESPERDICIOS, MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "48",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "CIMBRA DE MADERA ACABADO COMÚN PARA CONSTRUCCIÓN DE ELEMENTOS ESTRUCTURALES, INCLUYE CORTES, HABILITADO, ENCOFRADO, MADERA DE REFUERZO, SELLADO DE JUNTAS, LUBRICACIÓN Y RETIRO MATERIALES, HERRAMIENTA, EQUIPOS Y MANO DE OBRA P.U.O.T",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "49",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "SUMINISTRO Y VACIADO DE CONCRETO HIDRAULICO PREMEZCLADO DE F'C=250 KG/CM² DE RESISTENCIA NORMAL A LOS 28 DIAS CON REVENIMIENTO DE ±12 CM. Y TAMAÑO MAXIMO DE AGREGADO DE 3/4\", EN (DADOS, CASTILLOS, DALAS Y ZAPATA) INCLUYE : DESCARGA A TIRO DIRECTO DE LOS CAMIONES REVOLVEDORAS, MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN, P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",
      "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    },
    {
      "number": "50",
      "cucop_code": "62601-0007",
      "specific_item_code": "62601",
      "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
      "description": "RELLENO Y COMPACTACIÓN CON EQUIPO MECÁNICO AL 95% PROCTOR CON MATERIAL PRODUCTO DE  EXCAVACION DE ACUERDO A PROYECTO, EN CAPAS NO MAYORES DE 20 CM., (VOLUMEN MEDIDO EN BANCO) INCLUYE: COMPACTACIÓN, INCORPORACIÓN DE AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO. P.U.O.T.",
      "requested_quantity": null,
      "minimum_quantity": null,
      "maximum_quantity": null,
      "unit": null,
      "minimum_amount": null,
      "maximum_amount": null,
      "partida_code": "62601",