  "html_url": "https://postor.com.mx/licitacion/lo-13-j2w-013j2w002-n-3-2026",
  "canonical": "https://postor.com.mx/licitacion/lo-13-j2w-013j2w002-n-3-2026",
  "id": "54c95b2e310445dfac8017b4a133cb99",
  "procedure_number": "LO-13-J2W-013J2W002-N-3-2026",
  "file_number": "E-2026-00033144",
  "title": "AMPLIACIÓN DEL MUELLE DE GRANELES (POSICIÓN NO. 3) DEL PUERTO DE TOPOLOBAMPO.",
  "description": {
    "short": null,
    "detailed": "CONSTRUCCIÓN DE LA PRIMERA ETAPA DE LA AMPLIACIÓN DEL MUELLE (POSICIÓN NO.3) DEL PUERTO DE TOPOLOBAMPO CONSISTENTE EN COLOCACIÓN DE TABLAESTACA, RELLENO, HABILITADO DE ACERO DE REFUERZO, COLOCACIÓN DE CONCRETO PREMEZCLADO, BITAS DE AMARRE, DEFENSAS TIPO CÓNICAS Y PINTURA EN BALIZADO Y PANTALLAS."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": "2026-05-15T07:34:40.248Z"
  },
  "buyer": {
    "agency": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL TOPOLOBAMPO, S.A. DE C.V.",
    "acronym": "ASIPONA-TOPOLOBAMPO",
    "branch": "13 - MARINA",
    "buying_unit": "TOPOLOBAMPO-GERENCIA DE OPERACIONES E INGENIERIA",
    "requesting_unit": null,
    "requesting_group": "TOPOLOBAMPO-GERENCIA DE OPERACIONES E INGENIERIA",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "asipona-topolobampo",
    "unit_slug": "topolobampo-gerencia-de-operaciones-e-ingenieria-013j2w002"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2026,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "LO-013J2W002-N3-2026",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2026-04-06T20:32:26.000Z",
    "clarification_meeting_at": "2026-04-15T16:00:00.000Z",
    "clarification_questions_deadline_at": "2026-04-14T16:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2026-04-23T16:00:00.000Z",
    "award_at": "2026-05-04T22:00:00.000Z",
    "estimated_contract_at": "2026-05-11T06:00:00.000Z",
    "site_visit_at": "2026-04-14T16:00:00.000Z",
    "estimated_work_start_at": "2026-05-14T06:00:00.000Z"
  },
  "locations": {
    "state_id": "25",
    "state": "SINALOA",
    "bid_opening": "SALA DE JUNTAS DE LA GERENCIA DE ADMINISTRACIÓN Y FINANZAS, UBICADA DENTRO DE LAS INSTALACIONES DEL RECINTO PORTUARIO (EDIFICIO ADMINISTRATIVO (ZONA 2)",
    "award": "SALA DE JUNTAS DE LA GERENCIA DE OPERACIONES E INGENIERÍA, UBICADA DENTRO DE LAS INSTALACIONES DEL RECINTO PORTUARIO (EDIFICIO DE OPERACIONES E INGENIERÍA (ZONA 4)",
    "clarification_meeting": "SALA DE JUNTAS DE LA GERENCIA DE OPERACIONES E INGENIERÍA, UBICADA DENTRO DE LAS INSTALACIONES DEL RECINTO PORTUARIO (EDIFICIO DE OPERACIONES E INGENIERÍA (ZONA 4)",
    "site_visit": "oficina del Departamento de Proyectos y Construcción, ubicada dentro de las instalaciones del Recinto Portuario (Edificio de operaciones e ingeniería, zona 4)",
    "work_site": "muelles de graneles ubicado en la zona 4 del recinto portuario establecido en Acceso Parque Industrial Pesquero S/N, Recinto Portuario, C.P. 81370,Topolobampo, Sinaloa"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "1",
    "supplier_percentage": "10",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "PUNTOS Y PORCENTAJES",
    "technical_points": "50",
    "economic_points": "50"
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": false,
    "other_insurance_description": null,
    "performance_reduction": null
  },
  "participation": {
    "method": "ELECTRÓNICA",
    "joint": true,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": false,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": true,
    "duration_days": "197",
    "procurement_term": "Normal",
    "subcontracted_work": null,
    "deadline_justification": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62601-0002",
          "specific_item_code": "62601",
          "cucop_description": "CONSTRUCCION DE OBRA MARITIMA",
          "description": "AMPLIACIÓN DEL MUELLE DE GRANELES (POSICIÓN NO. 3) DEL PUERTO DE TOPOLOBAMPO",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "62601",
          "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "62601",
      "description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
    }
  ],
  "awards": [
    {
      "id": "C-2026-00037083",
      "internal_reference": "ASIPONA-TOPO-OP-03-26",
      "title": "AMPLIACIÓN DEL MUELLE DE GRANELES (POSICIÓN NO. 3) DEL PUERTO DE TOPOLOBAMPO.",
      "status": "PUBLICADO",
      "contractor": {
        "name": "CONSTRUCTORA Y ARRENDADORA LOPEZ SA DE CV",
        "normalized_name": "CONSTRUCTORA Y ARRENDADORA LOPEZ",
        "rfc_type": null,
        "slug": "constructora-y-arrendadora-lopez"
      },
      "contract_period": {
        "published_at": "2026-05-11T22:38:57.000Z",
        "starts_at": "2026-05-14T06:00:00.000Z",
        "ends_at": "2026-11-26T06:00:00.000Z"
      },
      "value": {
        "subtotal": "46975663.37",
        "tax": "7516106.14",
        "total": "54491769.51",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62601-0002",
          "description": "AMPLIACIÓN DEL MUELLE DE GRANELES (POSICIÓN NO. 3) DEL PUERTO DE TOPOLOBAMPO",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "46975663.37",
          "tax": "7516106.14",
          "other_taxes": null,
          "total": "54491769.51",
          "cucop_description": "CONSTRUCCION DE OBRA MARITIMA",
          "partida_code": "62601",
          "partida_description": "OTRAS CONSTRUCCIONES DE INGENIERÍA CIVIL U OBRA PESADA"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "BASES N3 2026.pdf",
      "availability": "available",
      "size_bytes": "8738151",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:50:49.451Z",
      "updated_at": "2026-04-06T20:51:03.875Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "ACTA DIF N3.pdf",
      "availability": "available",
      "size_bytes": "389862",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-30T05:14:23.804Z",
      "updated_at": "2026-04-30T05:14:24.028Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "CAT CONCEPTOS.xlsx",
      "availability": "available",
      "size_bytes": "110698",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:50:51.633Z",
      "updated_at": "2026-04-06T20:51:04.085Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "MOD CONT.pdf",
      "availability": "available",
      "size_bytes": "1898302",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:50:53.967Z",
      "updated_at": "2026-04-06T20:51:04.087Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "PLANOS",
      "filename": "PLANOS.zip",
      "availability": "available",
      "size_bytes": "13454418",
      "mime_type": "application/zip",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:50:58.009Z",
      "updated_at": "2026-04-06T20:51:08.720Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "ANEXOS SGI",
      "filename": "SGI.zip",
      "availability": "available",
      "size_bytes": "43225792",
      "mime_type": "application/zip",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:03.653Z",
      "updated_at": "2026-04-06T20:51:18.240Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ACTA VISITA DE OBRA",
      "filename": "ACTA V N3.pdf",
      "availability": "available",
      "size_bytes": "2385033",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-15T03:37:57.422Z",
      "updated_at": "2026-04-15T03:37:57.642Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "MOD FIANZAS.zip",
      "availability": "available",
      "size_bytes": "361958",
      "mime_type": "application/zip",
      "sha256": null,
      "uploaded_at": "2026-04-16T01:03:01.854Z",
      "updated_at": "2026-04-16T01:03:14.020Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "ESPECIFICS.pdf",
      "availability": "available",
      "size_bytes": "1597404",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-16T01:03:03.892Z",
      "updated_at": "2026-04-16T01:03:14.118Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "UB ZAPATA.pdf",
      "availability": "available",
      "size_bytes": "1574655",
      "mime_type": "application/pdf",
      "sha256": "bd5b4b844fedff8fafd2589a15a003ab7ed37ddd81116dde977595b18dcbb56a",
      "uploaded_at": "2026-04-16T01:03:05.908Z",
      "updated_at": "2026-08-05T21:59:20.602Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "acta_junta_de_aclaraciones-firmada.pdf",
      "availability": "available",
      "size_bytes": "1819545",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-16T01:03:09.215Z",
      "updated_at": "2026-04-16T01:03:14.022Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "CAT MODIF JA.xlsx",
      "availability": "available",
      "size_bytes": "109734",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2026-04-16T01:03:10.896Z",
      "updated_at": "2026-04-16T01:03:14.115Z"
    },
    {
      "id": "dc45b634-1dc3-4c7a-a9fc-f6554393095b",
      "annex_number": 14,
      "document_type": null,
      "description": "PLANO UBICACION ZAPATA",
      "filename": "UB ZAPATA.pdf",
      "availability": "available",
      "size_bytes": "1574655",
      "mime_type": "application/pdf",
      "sha256": "bd5b4b844fedff8fafd2589a15a003ab7ed37ddd81116dde977595b18dcbb56a",
      "uploaded_at": "2026-08-06T10:40:22.091Z",
      "updated_at": "2026-08-06T10:40:22.091Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "acta_de_apertura_de_proposiciones-firmada.pdf",
      "availability": "available",
      "size_bytes": "1819659",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-23T23:05:40.686Z",
      "updated_at": "2026-04-23T23:05:40.903Z"
    },
    {
      "id": null,
      "annex_number": 17,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "acta_de_fallo-firmada.pdf",
      "availability": "available",
      "size_bytes": "1525700",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-05-15T07:34:42.972Z",
      "updated_at": "2026-05-15T07:34:43.215Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-1.pdf",
      "availability": "available",
      "size_bytes": "1123361",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:05.317Z",
      "updated_at": "2026-04-06T20:51:05.318Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-2.pdf",
      "availability": "available",
      "size_bytes": "782605",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:05.549Z",
      "updated_at": "2026-04-06T20:51:05.549Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-3.pdf",
      "availability": "available",
      "size_bytes": "818883",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:05.915Z",
      "updated_at": "2026-04-06T20:51:05.916Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-4.pdf",
      "availability": "available",
      "size_bytes": "754810",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:06.174Z",
      "updated_at": "2026-04-06T20:51:06.174Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-5.pdf",
      "availability": "available",
      "size_bytes": "916995",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:06.416Z",
      "updated_at": "2026-04-06T20:51:06.416Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-6.pdf",
      "availability": "available",
      "size_bytes": "828026",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:06.669Z",
      "updated_at": "2026-04-06T20:51:06.669Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-7.pdf",
      "availability": "available",
      "size_bytes": "1042795",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:07.010Z",
      "updated_at": "2026-04-06T20:51:07.010Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "ASIPONA-17-23-PAM-8.pdf",
      "availability": "available",
      "size_bytes": "1031467",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:07.375Z",
      "updated_at": "2026-04-06T20:51:07.375Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "CIMENTACION DE BITA.pdf",
      "availability": "available",
      "size_bytes": "723143",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:07.671Z",
      "updated_at": "2026-04-06T20:51:07.671Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "Planta _RASANTES-ETAPA 1.pdf",
      "availability": "available",
      "size_bytes": "1449011",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:07.945Z",
      "updated_at": "2026-04-06T20:51:07.945Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "Planta Ampliacion de muelle3 (primera etapa).pdf",
      "availability": "available",
      "size_bytes": "1469391",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:08.186Z",
      "updated_at": "2026-04-06T20:51:08.187Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "SECCIONES-ETAPA 1(1de2).pdf",
      "availability": "available",
      "size_bytes": "1472459",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:08.472Z",
      "updated_at": "2026-04-06T20:51:08.472Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "SECCIONES-ETAPA 1(2de2).pdf",
      "availability": "available",
      "size_bytes": "1897783",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:08.718Z",
      "updated_at": "2026-04-06T20:51:08.718Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "F 01 REV 04.pdf",
      "availability": "available",
      "size_bytes": "509700",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:11.375Z",
      "updated_at": "2026-04-06T20:51:11.375Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "G 01.pdf",
      "availability": "available",
      "size_bytes": "2956173",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:11.763Z",
      "updated_at": "2026-04-06T20:51:11.763Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "P 06.pdf",
      "availability": "available",
      "size_bytes": "5317040",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:12.582Z",
      "updated_at": "2026-04-06T20:51:12.582Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "PLAN DE AT EM.pdf",
      "availability": "available",
      "size_bytes": "11171612",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:13.444Z",
      "updated_at": "2026-04-06T20:51:13.445Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "RG 01 REV 03.pdf",
      "availability": "available",
      "size_bytes": "17899596",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:15.542Z",
      "updated_at": "2026-04-06T20:51:15.542Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "SM SGI P 10.pdf",
      "availability": "available",
      "size_bytes": "6591104",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:17.027Z",
      "updated_at": "2026-04-06T20:51:17.027Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "SM SGI P 11.pdf",
      "availability": "available",
      "size_bytes": "5728570",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:17.819Z",
      "updated_at": "2026-04-06T20:51:17.819Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "TABLA DE SANC.pdf",
      "availability": "available",
      "size_bytes": "972895",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-06T20:51:18.236Z",
      "updated_at": "2026-04-06T20:51:18.236Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "4 1 Mod fza DOF.pdf",
      "availability": "available",
      "size_bytes": "257857",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-16T01:03:13.802Z",
      "updated_at": "2026-04-16T01:03:13.803Z"
    },
    {
      "id": null,
      "annex_number": null,
      "document_type": null,
      "description": null,
      "filename": "4 2 Mod fza cum.pdf",
      "availability": "available",
      "size_bytes": "123462",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-04-16T01:03:14.017Z",
      "updated_at": "2026-04-16T01:03:14.017Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-09-06T00:04:36.553Z",
    "last_seen_at": "2026-09-25T21:42:49.058Z",
    "first_seen_at": "2026-04-06T20:50:41.965Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2026-09-18T23:30:07.475Z"
  },
  "context": {
    "suppliers": [
      {
        "slug": "constructora-y-arrendadora-lopez",
        "name": "CONSTRUCTORA Y ARRENDADORA LOPEZ SA DE CV",
        "total_contracts": 13,
        "total_awarded_amount": "502543937.06",
        "median_amount": "29084367.59",
        "distinct_buyers": 3,
        "first_contract_at": "2023-06-01T00:00:00.000Z",
        "last_contract_at": "2026-06-15T00:00:00.000Z",
        "with_this_buyer": {
          "contracts": 2,
          "amount": "82329737.19"
        },
        "refreshed_at": "2026-09-16T00:56:30.797Z"
      }
    ],
    "buyer": {
      "slug": "asipona-topolobampo",
      "name": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL TOPOLOBAMPO, S.A. DE C.V.",
      "total_procedures": 95,
      "distinct_suppliers": 52,
      "procedures_by_type": {
        "LICITACIÓN PÚBLICA": 35,
        "ADJUDICACIÓN DIRECTA": 41,
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 18,
        "CONTRATO ESPECÍFICO DERIVADO DE ACUERDO MARCO": 1
      },
      "refreshed_at": "2026-09-23T00:15:04.151Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-13-j2w-013j2w002-n-9-2026",
      "nombre_procedimiento": "AMPLIACIÓN DEL MUELLE DE GRANELES (POSICIÓN NO. 3), SEGUNDA ETAPA DEL PUERTO DE",
      "dependencia": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL TOPOLOBAMPO, S.A. DE C.V.",
      "siglas": "ASIPONA-TOPOLOBAMPO",
      "score": 0.05954981560108852,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-07-02T15:30:00.000Z",
      "fecha_publicacion": "2026-06-08T19:50:18.000Z",
      "ganador": "MARINAS Y URBANIZACIONES GRAN TURISMO SA DE CV",
      "ganador_slug": "marinas-y-urbanizaciones-gran-turismo",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "34253993.07"
    },
    {
      "numero_procedimiento": "lo-13-j2w-013j2w002-n-4-2026",
      "nombre_procedimiento": "SUPERVISIÓN EXTERNA PARA LA AMPLIACIÓN DEL MUELLE DE GRANELES (POSICIÓN NO. 3) D",
      "dependencia": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL TOPOLOBAMPO, S.A. DE C.V.",
      "siglas": "ASIPONA-TOPOLOBAMPO",
      "score": 0.09593832492827725,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-05-06T16:00:00.000Z",
      "fecha_publicacion": "2026-04-06T18:13:30.000Z",
      "ganador": "RAM INGENIERIA Y SERVICIOS SA DE CV",
      "ganador_slug": "ram-ingenieria-y-servicios",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "2634799.04"
    },
    {
      "numero_procedimiento": "lo-13-j2w-013j2w002-n-8-2026",
      "nombre_procedimiento": "SUPERVISIÓN EXTERNA PARA LA AMPLIACIÓN DEL MUELLE DE GRANELES (POSICIÓN NO. 3) S",
      "dependencia": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL TOPOLOBAMPO, S.A. DE C.V.",
      "siglas": "ASIPONA-TOPOLOBAMPO",
      "score": 0.10160333523770027,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-07-02T16:00:00.000Z",
      "fecha_publicacion": "2026-06-08T18:07:25.000Z",
      "ganador": "ROCHER INGENIERIA SA DE CV",
      "ganador_slug": "rocher-ingenieria",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "1833105.73"
    },
    {
      "numero_procedimiento": "lo-13-j3e-013j3e002-n-47-2025",
      "nombre_procedimiento": "CONSTRUCCIÓN DE UN MUELLE PARA EMBARCACIONES DE SERVICIOS PORTUARIOS",
      "dependencia": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL VERACRUZ, S.A. DE C.V.",
      "siglas": "ASIPONA-VERACRUZ",
      "score": 0.1423627307847417,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-10-15T16:00:00.000Z",
      "fecha_publicacion": "2025-09-15T18:06:00.000Z",
      "ganador": "SG CIMENTACIONES Y PUERTOS SA DE CV",
      "ganador_slug": "sg-cimentaciones-y-puertos",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "115683296.19"
    },
    {
      "numero_procedimiento": "lo-13-j3e-013j3e002-n-4-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DE UN MUELLE DE SERVICIOS DE REMOLCADORES UBICADO EN LA BAHÍA NORTE",
      "dependencia": "ASIPONA-VERACRUZ",
      "siglas": "ASIPONA-VERACRUZ",
      "score": 0.16383535646410774,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-04-19T10:00:00.000Z",
      "fecha_publicacion": "2023-03-23T20:39:55.000Z",
      "ganador": "CONSTRUCCIONES MDE SA DE CV",
      "ganador_slug": "construcciones-mde",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "127131210.04"
    },
    {
      "numero_procedimiento": "lo-13-j2w-013j2w002-n-6-2026",
      "nombre_procedimiento": "PROGRAMA DE MANTENIMIENTO A INFRAESTRUCTURA PORTUARIA EN MUELLES, PATIOS Y SEÑAL",
      "dependencia": "ADMINISTRACION DEL SISTEMA PORTUARIO NACIONAL TOPOLOBAMPO, S.A. DE C.V.",
      "siglas": "ASIPONA-TOPOLOBAMPO",
      "score": 0.17691440444674367,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-06-23T16:00:00.000Z",
      "fecha_publicacion": "2026-06-03T12:48:16.000Z",
      "ganador": "ICMA INGENIERIA CIVIL Y MEDIO AMBIENTE SA DE CV",
      "ganador_slug": "icma-ingenieria-civil-y-medio-ambiente",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "8166042.58"
    }
  ]
}