  "html_url": "https://postor.com.mx/licitacion/lo-09-j0u-009j0u006-n-5-2025",
  "canonical": "https://postor.com.mx/licitacion/lo-09-j0u-009j0u006-n-5-2025",
  "id": "7a61dddfb825479aa929657738915d6b",
  "procedure_number": "LO-09-J0U-009J0U006-N-5-2025",
  "file_number": "E-2025-00000163",
  "title": "MANTENIMIENTO MENOR DE LA AUTOPISTA SALTILLO - TORREÓN, TRAMO PLAN DE AYALA - EL",
  "description": {
    "short": null,
    "detailed": "MANTENIMIENTO MENOR DE LA AUTOPISTA SALTILLO - TORREÓN, TRAMO PLAN DE AYALA - EL PORVENIR, INCLUYE ESTRUCTURAS."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "CAPUFE",
    "acronym": "CAPUFE",
    "branch": "09 - INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
    "buying_unit": "SUBGERENCIA TÉCNICA, UNIDAD REGIONAL SALTILLO",
    "requesting_unit": null,
    "requesting_group": "SUBGERENCIA TÉCNICA, UNIDAD REGIONAL SALTILLO",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "capufe",
    "unit_slug": "subgerencia-tecnica-unidad-regional-saltillo-009j0u006"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2025,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "LO-09-J0U-009J0U006-N-5-2025",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-01-03T01:07:18.000Z",
    "clarification_meeting_at": "2025-01-06T20:00:00.000Z",
    "clarification_questions_deadline_at": "2025-01-05T20:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2025-01-13T20:00:00.000Z",
    "award_at": "2025-01-29T17:30:00.000Z",
    "estimated_contract_at": "2025-02-01T06:00:00.000Z",
    "site_visit_at": "2025-01-03T16:00:00.000Z",
    "estimated_work_start_at": "2025-02-01T06:00:00.000Z"
  },
  "locations": {
    "state_id": "8",
    "state": "COAHUILA DE ZARAGOZA",
    "bid_opening": "SALA DE JUNTAS DE LA SUBGERENCIA TÉCNICA DE LA UNIDAD REGIONAL SALTILLO DE CAPUFE, BLVD. VENUSTIANO CARRANZA NÚMERO 8272 (PLANTA ALTA) COLONIA LOS RODRIGUEZ, SALTILLO, COAHUILA, C.P. 25206",
    "award": "SALA DE JUNTAS DE LA SUBGERENCIA TÉCNICA DE LA UNIDAD REGIONAL SALTILLO DE CAPUFE, BLVD. VENUSTIANO CARRANZA NÚMERO 8272 (PLANTA ALTA) COLONIA LOS RODRIGUEZ, SALTILLO, COAHUILA, C.P. 25206",
    "clarification_meeting": "SALA DE JUNTAS DE LA SUBGERENCIA TÉCNICA DE LA UNIDAD REGIONAL SALTILLO DE CAPUFE, BLVD. VENUSTIANO CARRANZA NÚMERO 8272 (PLANTA ALTA) COLONIA LOS RODRIGUEZ, SALTILLO, COAHUILA, C.P. 25206",
    "site_visit": "Superintendencia de Conservación km. 0+600 Autopista Saltillo-Torreón, tramo Plan de Ayala-El Porvenir;",
    "work_site": "AUTOPISTA SALTILLO - TORREÓN, TRAMO PLAN DE AYALA - EL PORVENIR"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "0",
    "supplier_percentage": "20",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "BINARIO",
    "technical_points": null,
    "economic_points": null
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": true,
    "other_insurance_description": "RESPONSABILIDAD CIVIL",
    "performance_reduction": null
  },
  "participation": {
    "method": "MIXTA",
    "joint": true,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": null,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": true,
    "duration_days": "365",
    "procurement_term": "Recortado",
    "subcontracted_work": null,
    "deadline_justification": "NECESIDAD DE EJECUCIÓN DE LA OBRA"
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62502-0002",
          "specific_item_code": "62502",
          "cucop_description": "CONSERVACION Y/O MANTENIMIENTO DE AUTOPISTA",
          "description": "MANTENIMIENTO MENOR DE LA AUTOPISTA SALTILLO - TORREÓN, TRAMO PLAN DE AYALA - EL PORVENIR, INCLUYE ESTRUCTURAS.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "62502",
          "partida_description": "MANTENIMIENTO Y REHABILITACIÓN DE LAS VÍAS DE COMUNICACIÓN"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "62502",
      "description": "MANTENIMIENTO Y REHABILITACIÓN DE LAS VÍAS DE COMUNICACIÓN"
    }
  ],
  "awards": [
    {
      "id": "C-2025-00006331",
      "internal_reference": "4500035627",
      "title": "MANTENIMIENTO MENOR DE LA AUTOPISTA SALTILLO - TORREÓN, TRAMO PLAN DE AYALA - EL",
      "status": "PUBLICADO",
      "contractor": {
        "name": "BITUMEN Y CONCRETO SA DE CV",
        "normalized_name": "BITUMEN Y CONCRETO",
        "rfc_type": null,
        "slug": "bitumen-y-concreto"
      },
      "contract_period": {
        "published_at": "2025-01-30T16:46:40.000Z",
        "starts_at": "2025-02-01T06:00:00.000Z",
        "ends_at": "2026-01-31T06:00:00.000Z"
      },
      "value": {
        "subtotal": "25519974.76",
        "tax": "4083195.96",
        "total": "29603170.72",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [
        {
          "number": "1",
          "name": "INFRAESTRUCTURA TERRESTRE SALU SA DE CV",
          "rfc_type": "moral",
          "slug": "infraestructura-terrestre-salu"
        }
      ],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62502-0002",
          "description": "MANTENIMIENTO MENOR DE LA AUTOPISTA SALTILLO - TORREÓN, TRAMO PLAN DE AYALA - EL PORVENIR, INCLUYE ESTRUCTURAS.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "25519974.76",
          "tax": "4083195.96",
          "other_taxes": null,
          "total": "29603170.72",
          "cucop_description": "CONSERVACION Y/O MANTENIMIENTO DE AUTOPISTA",
          "partida_code": "62502",
          "partida_description": "MANTENIMIENTO Y REHABILITACIÓN DE LAS VÍAS DE COMUNICACIÓN"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "CONVOCATORIA LO-09-J0U-009J0U006-N-5-2025 MENOR PA.pdf",
      "availability": "available",
      "size_bytes": "618832",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:29:35.774Z",
      "updated_at": "2025-11-03T09:29:35.775Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "URS-ST-0067-2025 Dif Fallo N-5-2025 firmado.pdf",
      "availability": "available",
      "size_bytes": "36015",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:33:40.240Z",
      "updated_at": "2025-11-03T09:33:40.241Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO A3 REGLAMENTO DE OBRA.doc",
      "availability": "available",
      "size_bytes": "29696",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:29:43.797Z",
      "updated_at": "2025-11-03T09:29:43.798Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO A4 NOTA INFORMATIVA.docx",
      "availability": "available",
      "size_bytes": "247369",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:29:51.842Z",
      "updated_at": "2025-11-03T09:29:51.843Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO B2 MODELO DE FIANZA CUMPLIMIENTO OBRA FINAL ELECTRONICA.doc",
      "availability": "available",
      "size_bytes": "37376",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:30:00.036Z",
      "updated_at": "2025-11-03T09:30:00.037Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO B2 MODELO DE FIANZA DEFECTOS Y VO OBRA DEL X  2015.doc",
      "availability": "available",
      "size_bytes": "39424",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:30:11.479Z",
      "updated_at": "2025-11-03T09:30:11.480Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO B3 ESCRITO DE ENTREGA DE GARANTIAS  OBRA.doc",
      "availability": "available",
      "size_bytes": "33792",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:30:22.044Z",
      "updated_at": "2025-11-03T09:30:22.046Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXO B4 OFICIO DE ENTREGA DE OPINIONES.doc",
      "availability": "available",
      "size_bytes": "31232",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:30:32.589Z",
      "updated_at": "2025-11-03T09:30:32.590Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXOS OBRA.doc",
      "availability": "available",
      "size_bytes": "80896",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:30:43.409Z",
      "updated_at": "2025-11-03T09:30:43.410Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "DOF  Diario Oficial de la Federacion 28 junio de 2017 INFONAVIT.pdf",
      "availability": "available",
      "size_bytes": "118876",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:30:54.988Z",
      "updated_at": "2025-11-03T09:30:54.989Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "FORMATO DE CONVENIO PARTICIPACION CONJUNTA.docx",
      "availability": "available",
      "size_bytes": "29245",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:31:05.030Z",
      "updated_at": "2025-11-03T09:31:05.031Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "FORMATO aceptacion transferencia de pago.docx",
      "availability": "available",
      "size_bytes": "12532",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:31:15.787Z",
      "updated_at": "2025-11-03T09:31:15.788Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "FTOSECXE OBRA.xls",
      "availability": "available",
      "size_bytes": "696832",
      "mime_type": "application/vnd.ms-excel",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:31:28.355Z",
      "updated_at": "2025-11-03T09:31:28.356Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Formato para Registro de Empresas Participantes y su Personal.xlsx",
      "availability": "available",
      "size_bytes": "312484",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:31:40.232Z",
      "updated_at": "2025-11-03T09:31:40.233Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Formatos BESOPv1 para alta del contrato y contratista.xls",
      "availability": "available",
      "size_bytes": "144896",
      "mime_type": "application/vnd.ms-excel",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:31:51.302Z",
      "updated_at": "2025-11-03T09:31:51.303Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "conflicto de interes modelo.docx",
      "availability": "available",
      "size_bytes": "13398",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:32:01.009Z",
      "updated_at": "2025-11-03T09:32:01.010Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "Modelo de contrato (1).docx",
      "availability": "available",
      "size_bytes": "281786",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:32:11.624Z",
      "updated_at": "2025-11-03T09:32:11.625Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "catalogo de conceptos",
      "filename": "CATALOGO N5 PLAN DE AYALA.xlsx",
      "availability": "available",
      "size_bytes": "78718",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:32:21.252Z",
      "updated_at": "2025-11-03T09:32:21.253Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "ESPECIFICACIONES PARTICULARES",
      "filename": "ESPECIFICACIONES PARTICULARES N-5 PLAN DE AYALA.docx",
      "availability": "available",
      "size_bytes": "2871509",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:32:32.525Z",
      "updated_at": "2025-11-03T09:32:32.526Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ESPECIFICACIONES COMPLEMENTARIAS",
      "filename": "2_3 ANEXO A1 ESPECIFICACIONES COMPLEMENTARIAS N5-2025.docx",
      "availability": "available",
      "size_bytes": "198912",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:32:40.799Z",
      "updated_at": "2025-11-03T09:32:40.800Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "CONSTANCIA DE VISITA",
      "filename": "ACTA DE VISITA N-5.pdf",
      "availability": "available",
      "size_bytes": "716603",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:32:50.212Z",
      "updated_at": "2025-11-03T09:32:50.213Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "ACTA DE JUNTA DE ACLARACIONES N-5-2024.pdf",
      "availability": "available",
      "size_bytes": "1040353",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:33:00.629Z",
      "updated_at": "2025-11-03T09:33:00.630Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "ANEXO 1 CRONOGRAMA.pdf",
      "availability": "available",
      "size_bytes": "1152080",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:33:10.304Z",
      "updated_at": "2025-11-03T09:33:10.305Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "ANEXO 2 EMPRESAS.pdf",
      "availability": "available",
      "size_bytes": "35963",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:33:19.941Z",
      "updated_at": "2025-11-03T09:33:19.942Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "Acta de Apertura LO-09-J0U-009J0U006-N-5-2025.pdf",
      "availability": "available",
      "size_bytes": "3260985",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:33:30.977Z",
      "updated_at": "2025-11-03T09:33:30.978Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "ACTA DE FALLO DE LA LICITACION NUMERO LO-009-009J0U006-N-5-2025.pdf",
      "availability": "available",
      "size_bytes": "1320561",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:33:50.006Z",
      "updated_at": "2025-11-03T09:33:50.007Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ANEXOS ACTA DE FALLO",
      "filename": "FALLO LPN LO-09-J0U-009J0U006-N-5-2025.pdf",
      "availability": "available",
      "size_bytes": "7927423",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-03T09:34:00.118Z",
      "updated_at": "2025-11-03T09:34:00.119Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-08-02T09:34:05.898Z",
    "last_seen_at": "2026-08-02T09:44:52.226Z",
    "first_seen_at": "2025-11-03T09:29:20.692Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2025-11-03T09:29:20.692Z"
  },
  "context": {
    "suppliers": [
      {
        "slug": "bitumen-y-concreto",
        "name": "BITUMEN Y CONCRETO SA DE CV",
        "total_contracts": 6,
        "total_awarded_amount": "139660477.38",
        "median_amount": "18972938.32",
        "distinct_buyers": 2,
        "first_contract_at": "2025-02-01T00:00:00.000Z",
        "last_contract_at": "2026-08-24T00:00:00.000Z",
        "with_this_buyer": {
          "contracts": 2,
          "amount": "50256379.12"
        },
        "refreshed_at": "2026-09-16T00:56:30.797Z"
      }
    ],
    "buyer": {
      "slug": "capufe",
      "name": "CAMINOS Y PUENTES FEDERALES DE INGRESOS Y SERVICIOS CONEXOS",
      "total_procedures": 3791,
      "distinct_suppliers": 1166,
      "procedures_by_type": {
        "LICITACIÓN PÚBLICA": 2469,
        "ADJUDICACIÓN DIRECTA": 1126,
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 190,
        "CONTRATO ESPECÍFICO DERIVADO DE ACUERDO MARCO": 6
      },
      "refreshed_at": "2026-09-26T05:15:02.000Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-09-j0u-009j0u006-n-5-2024",
      "nombre_procedimiento": "MANTENIMIENTO MENOR AUTOPISTA PLAN DE AYALA - EL PORVENIR",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.02506176010694461,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-01-29T11:30:00.000Z",
      "fecha_publicacion": "2024-01-09T19:54:53.000Z",
      "ganador": "INFRAESTRUCTURA TERRESTRE SALU SA DE CV",
      "ganador_slug": "infraestructura-terrestre-salu",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "20300093.35"
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u006-n-6-2025",
      "nombre_procedimiento": "MANTENIMIENTO MENOR DE LA AUTOPISTA SALTILLO - TORREÓN, TRAMO LA CUCHILLA - MATA",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.04188713556190671,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-01-29T12:00:00.000Z",
      "fecha_publicacion": "2025-01-02T19:34:46.000Z",
      "ganador": "OBRAS CIVILES DE LA LAGUNA SA DE CV",
      "ganador_slug": "obras-civiles-de-la-laguna",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "21909155.05"
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u002-n-22-2026",
      "nombre_procedimiento": "N-22/26 OFC MANTENIMIENTO MENOR DE LA AUTOPISTA SALTILLO - TORREÓN, TRAMO PLAN D",
      "dependencia": "CAMINOS Y PUENTES FEDERALES DE INGRESOS Y SERVICIOS CONEXOS",
      "siglas": "CAPUFE",
      "score": 0.041979527768421954,
      "anio_ejercicio": 2026,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2026-03-09T17:30:00.000Z",
      "fecha_publicacion": "2026-01-15T22:43:42.000Z",
      "ganador": "CONSTRUCTORA DEL NORTE TORRESA SA DE CV",
      "ganador_slug": "constructora-del-norte-torresa",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "26555947.52"
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u006-n-6-2024",
      "nombre_procedimiento": "MANTENIMIENTO MENOR AUTOPISTA CUCHILLA - MATAMOROS",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.0750646360276277,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2024-01-29T12:00:00.000Z",
      "fecha_publicacion": "2024-01-09T19:57:50.000Z",
      "ganador": "ISLA PROYECTOS Y CONSTRUCCIONES SA DE CV",
      "ganador_slug": "isla-proyectos-y-construcciones",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "17142587.04"
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u006-n-19-2025",
      "nombre_procedimiento": "TRABAJOS DE CONSERVACIÓN MENOR EN OBRAS DE DRENAJE, AUTOPISTA SALTILLO - TORREÓN",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.07658687918664553,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-03-31T11:00:00.000Z",
      "fecha_publicacion": "2025-02-25T11:14:31.000Z",
      "ganador": "ING. NARCISO SOTO SA DE CV",
      "ganador_slug": "ing-narciso-soto",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "4138244.97"
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u005-n-1-2025",
      "nombre_procedimiento": "MANTENIMIENTO MENOR QUERÉTARO - IRAPUATO",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.07664111941824059,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-01-29T12:00:00.000Z",
      "fecha_publicacion": "2025-01-07T13:04:46.000Z",
      "ganador": "TEBE CONSULTORES SA",
      "ganador_slug": "tebe-consultores",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "23374990.78"
    }
  ]
}