  "html_url": "https://postor.com.mx/invitacion/io-85-006-826056814-n-1-2025",
  "canonical": "https://postor.com.mx/invitacion/io-85-006-826056814-n-1-2025",
  "id": "40c6236f2b684aefbc96ad0b282b7539",
  "procedure_number": "IO-85-006-826056814-N-1-2025",
  "file_number": "E-2025-00052104",
  "title": "REHABILITACIÓN DE POZO NO. 2 SECUNDARIA, CONSTRUCCIÓN DE  LINEA CONDUCCIÓN 3\" P",
  "description": {
    "short": "Obras públicas o servicios relacionados con las mismas, dentro de los montos máximos establecidos en el PEF.",
    "detailed": "REHABILITACIÓN DE POZO NO. 2 SECUNDARIA (BOMBA Y MOTOR) , CONSTRUCCIÓN DE  LINEA CONDUCCIÓN 3\" PVC    EN LA LOCALIDAD DE ESTACIÓN PESQUEIRA, MUNICIPIO  DE SAN MIGUEL DE HORCASITAS, SONORA."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "SAN MIGUEL DE HORCASITAS",
    "acronym": "085006",
    "branch": "85 - SONORA",
    "buying_unit": "DIRECCIÓN DE OBRAS PÚBLICAS",
    "requesting_unit": null,
    "requesting_group": "DIRECCIÓN DE OBRAS PÚBLICAS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "085006",
    "unit_slug": "direccion-de-obras-publicas-826056814"
  },
  "classification": {
    "procedure_type": "INVITACIÓN A CUANDO MENOS TRES PERSONAS",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2025,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "59",
    "exception_basis": "Art. 43",
    "internal_control_number": "SMH-OP-02-2025",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-06-18T21:57:46.000Z",
    "clarification_meeting_at": "2025-06-24T20:00:00.000Z",
    "clarification_questions_deadline_at": "2025-06-23T20:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2025-07-02T20:00:00.000Z",
    "award_at": "2025-07-04T20:00:00.000Z",
    "estimated_contract_at": "2025-07-07T06:00:00.000Z",
    "site_visit_at": "2025-06-23T20:00:00.000Z",
    "estimated_work_start_at": "2025-07-07T06:00:00.000Z"
  },
  "locations": {
    "state_id": "26",
    "state": "SONORA",
    "bid_opening": "COMPRAS MX",
    "award": "COMPRAS MX",
    "clarification_meeting": "COMPRAS MX",
    "site_visit": "OFICINAS DE H. AYUNTAMIENTO DE SAN MIGUEL DE HORCASITAS, EN EST. PESQUEIRA",
    "work_site": "ESTACION PESQUEIRA, COL. CENTRO"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "1",
    "supplier_percentage": "10",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "BINARIO",
    "technical_points": null,
    "economic_points": null
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": false,
    "other_insurance_description": null,
    "performance_reduction": null
  },
  "participation": {
    "method": "ELECTRÓNICA",
    "joint": false,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": null,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": "NO REQUIERE DEBIDO AL MONTO DE LA OBRA"
  },
  "execution": {
    "site_visit_required": true,
    "duration_days": "60",
    "procurement_term": "Normal",
    "subcontracted_work": null,
    "deadline_justification": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62301-0001",
          "specific_item_code": "62301",
          "cucop_description": "CONSTRUCCION DE OBRA PARA EL ABASTECIMIENTO DE AGUA",
          "description": "REHABILITACIÓN DE POZO, CAMBIO DE BOMBA Y MOTOR, CONSTRUCCIÓN DE LINEA DE CONDUCCIÓN QUE LLEVA EL AGUA A TANQUE ELEVADO EXISTENTE",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "62301",
          "partida_description": "CONSTRUCCIÓN DE OBRAS PARA EL ABASTECIMIENTO DE AGUA, PETRÓLEO, GAS, ELECTRICIDAD Y TELECOMUNICACIONES"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "62301",
      "description": "CONSTRUCCIÓN DE OBRAS PARA EL ABASTECIMIENTO DE AGUA, PETRÓLEO, GAS, ELECTRICIDAD Y TELECOMUNICACIONES"
    }
  ],
  "awards": [
    {
      "id": "C-2025-00131283",
      "internal_reference": "SMH-PROAGUA-2025-01",
      "title": "REHABILITACIÓN DE POZO NO. 2 SECUNDARIA, CONSTRUCCIÓN DE  LINEA CONDUCCIÓN 3\" P",
      "status": "PUBLICADO",
      "contractor": {
        "name": "HSTECHCOM MEXICO S A P I DE CV",
        "normalized_name": "HSTECHCOM MEXICO",
        "rfc_type": null,
        "slug": "hstechcom-mexico"
      },
      "contract_period": {
        "published_at": "2025-12-10T21:53:05.000Z",
        "starts_at": "2025-07-08T06:00:00.000Z",
        "ends_at": "2025-09-05T06:00:00.000Z"
      },
      "value": {
        "subtotal": "1205873.24",
        "tax": "192939.72",
        "total": "1398812.96",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62301-0001",
          "description": "REHABILITACIÓN DE POZO, CAMBIO DE BOMBA Y MOTOR, CONSTRUCCIÓN DE LINEA DE CONDUCCIÓN QUE LLEVA EL AGUA A TANQUE ELEVADO EXISTENTE",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "1205873.24",
          "tax": "192939.72",
          "other_taxes": null,
          "total": "1398812.96",
          "cucop_description": "CONSTRUCCION DE OBRA PARA EL ABASTECIMIENTO DE AGUA",
          "partida_code": "62301",
          "partida_description": "CONSTRUCCIÓN DE OBRAS PARA EL ABASTECIMIENTO DE AGUA, PETRÓLEO, GAS, ELECTRICIDAD Y TELECOMUNICACIONES"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "INVITACIÓN",
      "filename": "B Pozo 02.doc",
      "availability": "available",
      "size_bytes": "627712",
      "mime_type": "application/msword",
      "sha256": "eadb40f18f2e6303d698fb2465853df92486d6ccc05cbbcdd8ece6530ec290ea",
      "uploaded_at": "2025-12-09T12:25:02.798Z",
      "updated_at": "2026-08-05T21:48:21.598Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "INVITACIÓN",
      "filename": "N-1 p02.pdf",
      "availability": "available",
      "size_bytes": "5544854",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:25:22.442Z",
      "updated_at": "2025-12-09T12:25:22.443Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FECHA Y HORA DE APERTURA DE PROPOSICIONES",
      "filename": "DIFERIN1.pdf",
      "availability": "available",
      "size_bytes": "301612",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:25:26.825Z",
      "updated_at": "2025-12-09T12:25:26.826Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "02-p01.pdf",
      "availability": "available",
      "size_bytes": "448602",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:24:41.353Z",
      "updated_at": "2025-12-09T12:24:41.354Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ALEGAL E12025.doc",
      "availability": "available",
      "size_bytes": "465920",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:24:43.640Z",
      "updated_at": "2025-12-09T12:24:43.641Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANXECO E1-2025.doc",
      "availability": "available",
      "size_bytes": "2057728",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:24:50.210Z",
      "updated_at": "2025-12-09T12:24:50.211Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ATEC E12025.doc",
      "availability": "available",
      "size_bytes": "639488",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:24:54.137Z",
      "updated_at": "2025-12-09T12:24:54.138Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "B Pozo 02.doc",
      "availability": "available",
      "size_bytes": "627712",
      "mime_type": "application/msword",
      "sha256": "eadb40f18f2e6303d698fb2465853df92486d6ccc05cbbcdd8ece6530ec290ea",
      "uploaded_at": "2025-12-09T12:24:56.100Z",
      "updated_at": "2026-08-05T21:48:21.598Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Cat Conc02.xlsx",
      "availability": "available",
      "size_bytes": "209367",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:24:57.382Z",
      "updated_at": "2025-12-09T12:24:57.383Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "FORMATOS_ 2025.xls",
      "availability": "available",
      "size_bytes": "1954816",
      "mime_type": "application/vnd.ms-excel",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:24:59.680Z",
      "updated_at": "2025-12-09T12:24:59.681Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "contrato.docx",
      "availability": "available",
      "size_bytes": "44672",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:25:00.952Z",
      "updated_at": "2025-12-09T12:25:00.954Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "CONSTANCIA DE VISITA",
      "filename": "ACTA DE VISn1.pdf",
      "availability": "available",
      "size_bytes": "358972",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:25:23.993Z",
      "updated_at": "2025-12-09T12:25:23.994Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "ACTA JUNTAN1.pdf",
      "availability": "available",
      "size_bytes": "220830",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:25:25.418Z",
      "updated_at": "2025-12-09T12:25:25.419Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "aper  N1.pdf",
      "availability": "available",
      "size_bytes": "242200",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:25:28.630Z",
      "updated_at": "2025-12-09T12:25:28.631Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "falloN1.pdf",
      "availability": "available",
      "size_bytes": "8613367",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T12:25:35.337Z",
      "updated_at": "2025-12-09T12:25:35.339Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-08-03T09:08:46.866Z",
    "last_seen_at": "2026-08-03T09:08:46.842Z",
    "first_seen_at": "2025-11-04T22:03:20.193Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2025-11-04T22:03:20.193Z"
  },
  "context": {
    "suppliers": [
      {
        "slug": "hstechcom-mexico",
        "name": "HSTECHCOM MEXICO S A P I DE CV",
        "total_contracts": 3,
        "total_awarded_amount": "5566494.04",
        "median_amount": "1398812.96",
        "distinct_buyers": 2,
        "first_contract_at": "2025-07-08T00:00:00.000Z",
        "last_contract_at": "2025-08-22T00:00:00.000Z",
        "with_this_buyer": {
          "contracts": 2,
          "amount": "4494707.52"
        },
        "refreshed_at": "2026-09-16T00:56:30.797Z"
      }
    ],
    "buyer": {
      "slug": "085006",
      "name": "SAN MIGUEL DE HORCASITAS",
      "total_procedures": 2,
      "distinct_suppliers": 1,
      "procedures_by_type": {
        "INVITACIÓN A CUANDO MENOS TRES PERSONAS": 2
      },
      "refreshed_at": "2026-09-16T00:00:58.979Z"
    }
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "io-85-006-826056814-n-2-2025",
      "nombre_procedimiento": "REHABILITACIÓN DE TANQUE ELEVADO Y POZO NO.3 (TINACO), SUMINISTRO E INSTALACIÓN",
      "dependencia": "SAN MIGUEL DE HORCASITAS",
      "siglas": "085006",
      "score": 0.075640650857706,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-07-04T15:00:00.000Z",
      "fecha_publicacion": "2025-06-18T15:58:29.000Z",
      "ganador": "HSTECHCOM MEXICO S A P I DE CV",
      "ganador_slug": "hstechcom-mexico",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "3095894.56"
    },
    {
      "numero_procedimiento": "io-85-001-826035835-n-1-2025",
      "nombre_procedimiento": "REHABILITACIÓN DE POZO EXISTENTE EL MORAL, DESAZOLVE, CEPILLADO Y LIMPIEZA, CONS",
      "dependencia": "085001",
      "siglas": "085001",
      "score": 0.1209751249812695,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-06-27T14:00:00.000Z",
      "fecha_publicacion": "2025-06-11T19:47:12.000Z",
      "ganador": "EMIGSOF CONSTRUCTORA SA DE CV",
      "ganador_slug": "emigsof-constructora",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "2836589.06"
    },
    {
      "numero_procedimiento": "io-85-h90-826018993-n-21-2023",
      "nombre_procedimiento": "REHABILITACIÓN, EQUIPAMIENTO EN POZO PROFUNDO EN LA COMISARÍA \"EL TOBARITO\"",
      "dependencia": "CAJEME",
      "siglas": "085H90",
      "score": 0.13458869262303952,
      "anio_ejercicio": 2023,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2023-07-20T12:00:00.000Z",
      "fecha_publicacion": "2023-07-07T16:23:24.000Z",
      "ganador": "POBONOR DRILLING S DE RL DE CV",
      "ganador_slug": "pobonor-drilling",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "4067105.78"
    },
    {
      "numero_procedimiento": "io-74-086-815106932-n-12-2025",
      "nombre_procedimiento": "REHABILITACIÓN DEL POZO TEMASCALTEPEC 2",
      "dependencia": "AGUA Y SANEAMIENTO DE TOLUCA",
      "siglas": "AYSTE",
      "score": 0.1357404928130055,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-12-22T11:30:00.000Z",
      "fecha_publicacion": "2025-12-08T21:00:41.000Z",
      "ganador": "CONSTRUCCIONES ICI SA DE CV",
      "ganador_slug": "construcciones-ici",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "3422513.35"
    },
    {
      "numero_procedimiento": "io-62-o17-903017989-n-2-2023",
      "nombre_procedimiento": "REHABILITACIÓN Y EQUIPAMIENTO ELECTROMECÁNICO DEL POZO DE AGUA POTABLE NO. 1",
      "dependencia": "COMISIÓN ESTATAL DEL AGUA (BCS)",
      "siglas": "062O17",
      "score": 0.14786287701538237,
      "anio_ejercicio": 2023,
      "estatus": "DESIERTO",
      "fecha_fallo": "2023-06-23T13:00:00.000Z",
      "fecha_publicacion": "2023-06-05T09:48:48.000Z",
      "ganador": null,
      "ganador_slug": null,
      "ganador_rfc_type": null,
      "ganadores": "0",
      "monto_mxn": null
    },
    {
      "numero_procedimiento": "io-74-086-815106932-n-4-2025",
      "nombre_procedimiento": "REHABILITACIÓN DEL POZO REAL DE SAN PABLO",
      "dependencia": "AGUA Y SANEAMIENTO DE TOLUCA",
      "siglas": "AYSTE",
      "score": 0.14894291314652486,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": "2025-12-17T10:00:00.000Z",
      "fecha_publicacion": "2025-12-02T19:21:22.000Z",
      "ganador": "DESARROLLADORA INMOBILIARIA Y CONSTRUCTORA AZTLAN SA DE CV",
      "ganador_slug": "desarrolladora-inmobiliaria-y-constructora-aztlan",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "3453869.69"
    }
  ]
}