  "html_url": "https://postor.com.mx/adjudicacion/ao-75-857-816016772-n-1-2024",
  "canonical": "https://postor.com.mx/adjudicacion/ao-75-857-816016772-n-1-2024",
  "id": "6ea72803e5614ffaa283e4dcebc2430c",
  "procedure_number": "AO-75-857-816016772-N-1-2024",
  "file_number": "E-2024-00031132",
  "title": "SEGUNDA ETAPA DE LA CONTINUACIÓN DE LA PAVIMENTACION A BASE DE CONCRETO HIDRAULI",
  "description": {
    "short": "Obras públicas o servicios relacionados con las mismas, dentro de los montos máximos establecidos en el PEF.",
    "detailed": "SEGUNDA ETAPA DE LA CONTINUACIÓN DE LA PAVIMENTACION A BASE DE CONCRETO HIDRAULICO DE LA CALLE FRANCISCO I MADERO, EN LA LOCALIDAD DE SAN PEDRO ZIPIAJO, MUNICIPIO DE COENEO MICHOACÁN"
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "075857",
    "acronym": "075857",
    "branch": "75 - MICHOACÁN DE OCAMPO",
    "buying_unit": "DIRECCIÓN DE URBANISMO Y OBRAS PÚBLICAS",
    "requesting_unit": null,
    "requesting_group": "DIRECCIÓN DE URBANISMO Y OBRAS PÚBLICAS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "unit_slug": "direccion-de-urbanismo-y-obras-publicas-816016772"
  },
  "classification": {
    "procedure_type": "ADJUDICACIÓN DIRECTA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2024,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "74",
    "exception_basis": "Art. 43",
    "internal_control_number": "SEGUNDA ETAPA DE LA CONTINUACIÓN DE LA PAVIMENTACION A BASE DE CONCRETO HIDRAULI",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2024-04-03T02:47:01.000Z",
    "clarification_meeting_at": null,
    "clarification_questions_deadline_at": null,
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2024-04-16T16:00:00.000Z",
    "award_at": null,
    "estimated_contract_at": "2024-04-22T06:00:00.000Z",
    "site_visit_at": null,
    "estimated_work_start_at": "2024-04-22T06:00:00.000Z"
  },
  "locations": {
    "state_id": "15",
    "state": "MICHOACÁN DE OCAMPO",
    "bid_opening": null,
    "award": null,
    "clarification_meeting": null,
    "site_visit": null,
    "work_site": "SAN PEDRO ZIPIAJO"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "financial_terms": {
    "currency": "MXN",
    "advance_percentage": "1",
    "supplier_percentage": "10",
    "payment_method": null,
    "credit_condition": null,
    "payment_conditions": "EN CUYO CASO EL IMPORTE DE LA REMUNERACIÓN O PAGO TOTAL QUE DEBA CUBRIRSE AL CONTRATISTA SE HARÁ POR UNIDAD DE CONCEPTO DE TRABAJO TERMINADO",
    "financing_organization": null
  },
  "evaluation": {
    "criterion": "BINARIO",
    "technical_points": null,
    "economic_points": null
  },
  "guarantees": {
    "performance_required": true,
    "goods_or_services_required": true,
    "amount_percentage": null,
    "delivery_days": null,
    "term_months": "12",
    "other_insurance_required": false,
    "other_insurance_description": null,
    "performance_reduction": null
  },
  "participation": {
    "method": null,
    "joint": false,
    "msme_only": false,
    "social_witness": false,
    "multi_year": false,
    "open_contract": false,
    "consolidated_purchase": false,
    "external_credit": false,
    "simultaneous_supply": false,
    "subcontracting": null,
    "emergency": false,
    "proposal_language": "idioma data",
    "no_joint_participation_justification": null
  },
  "execution": {
    "site_visit_required": false,
    "duration_days": "29",
    "procurement_term": "Normal",
    "subcontracted_work": null,
    "deadline_justification": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "61500-0104",
          "specific_item_code": "61500",
          "cucop_description": "CONSTRUCCION DE CAMINO",
          "description": "SEGUNDA ETAPA DE LA CONTINUACIÓN DE LA PAVIMENTACION A BASE DE CONCRETO HIDRAULICO DE LA CALLE FRANCISCO I MADERO, EN LA LOCALIDAD DE SAN PEDRO ZIPIAJO, MUNICIPIO DE COENEO MICHOACÁN",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null,
          "partida_code": "61500",
          "partida_description": "CONSTRUCCIÓN DE VÍAS DE COMUNICACIÓN"
        }
      ]
    }
  ],
  "budget_items": [
    {
      "code": "61500",
      "description": "CONSTRUCCIÓN DE VÍAS DE COMUNICACIÓN"
    }
  ],
  "awards": [
    {
      "id": "C-2024-00044723",
      "internal_reference": "AO-75-857-816016772-N-1-2024",
      "title": "SEGUNDA ETAPA DE LA CONTINUACIÓN DE LA PAVIMENTACION A BASE DE CONCRETO HIDRAULI",
      "status": "PUBLICADO",
      "contractor": {
        "name": "PEDRO MORENO HEREDIA",
        "normalized_name": "PEDRO MORENO HEREDIA",
        "rfc_type": null
      },
      "contract_period": {
        "published_at": "2024-04-19T19:04:48.000Z",
        "starts_at": "2024-04-22T06:00:00.000Z",
        "ends_at": "2024-05-20T06:00:00.000Z"
      },
      "value": {
        "subtotal": "465025.18",
        "tax": "74404.03",
        "total": "539429.21",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "61500-0104",
          "description": "SEGUNDA ETAPA DE LA CONTINUACIÓN DE LA PAVIMENTACION A BASE DE CONCRETO HIDRAULICO DE LA CALLE FRANCISCO I MADERO, EN LA LOCALIDAD DE SAN PEDRO ZIPIAJO, MUNICIPIO DE COENEO MICHOACÁN",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "465025.18",
          "tax": "74404.03",
          "other_taxes": null,
          "total": "539429.21",
          "cucop_description": "CONSTRUCCION DE CAMINO",
          "partida_code": "61500",
          "partida_description": "CONSTRUCCIÓN DE VÍAS DE COMUNICACIÓN"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ANEXOS  TECNICOS PAV. SAN PEDRO ZIPIAJO.doc",
      "availability": "available",
      "size_bytes": "1236992",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:12:46.553Z",
      "updated_at": "2025-12-04T22:12:46.554Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "CATALAGO DE CONCEPTOS",
      "filename": "CATALOGO DE CONCEPTOS ZIPIAJO 2024 (1).pdf",
      "availability": "available",
      "size_bytes": "230347",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:12:48.429Z",
      "updated_at": "2025-12-04T22:12:48.430Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "bases",
      "filename": "BASES FEDERAL PAV. SAN PEDRO ZIPIAJO.doc",
      "availability": "available",
      "size_bytes": "311808",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:12:51.022Z",
      "updated_at": "2025-12-04T22:12:51.023Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "PLANO ARQUITECTONICO",
      "filename": "2-2-ARQUITECTONICO.pdf",
      "availability": "available",
      "size_bytes": "1083990",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:12:52.920Z",
      "updated_at": "2025-12-04T22:12:52.921Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "PLANO TOPOGRAFICO",
      "filename": "1-2-TOPOGRAFICO.pdf",
      "availability": "available",
      "size_bytes": "687367",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:12:54.743Z",
      "updated_at": "2025-12-04T22:12:54.744Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "anexos economicos",
      "filename": "ANEXOS  ECONOMICOS SAN PEDRO ZIPIAJO.doc",
      "availability": "available",
      "size_bytes": "942080",
      "mime_type": "application/msword",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:12:58.605Z",
      "updated_at": "2025-12-04T22:12:58.606Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ACTA DE VISITA DE OBRA",
      "filename": "visita al sitio segunda etapa pavimentacion en calle Francisco I Madero (1).pdf",
      "availability": "available",
      "size_bytes": "653687",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:13:00.550Z",
      "updated_at": "2025-12-04T22:13:00.551Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "ACTA DE JUNTA DE ACLARACIONES",
      "filename": "junta de aclaraciones segunda etapa  de la pavimentacion en calle Francisco I Madero (1).pdf",
      "availability": "available",
      "size_bytes": "683265",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:13:02.450Z",
      "updated_at": "2025-12-04T22:13:02.452Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ACTA DE APERTURA DE COTIZACION",
      "filename": "ACTA DE PRESENTACION Y APERTURA DE LA COTIZACION.pdf",
      "availability": "available",
      "size_bytes": "3539604",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:13:07.163Z",
      "updated_at": "2025-12-04T22:13:07.164Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "ACTA DE FALLO PAVIMENTACION EN ZIPIAJO.pdf",
      "availability": "available",
      "size_bytes": "1076357",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:13:09.107Z",
      "updated_at": "2025-12-04T22:13:09.108Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "OFICIO DE ADJUDICACIÓN",
      "filename": "CONTRATO SEGUNDA ETAPA DE PAVIMENTACON EN ZIPIAJO.pdf",
      "availability": "available",
      "size_bytes": "11303686",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T22:13:22.436Z",
      "updated_at": "2025-12-04T22:13:22.437Z"
    }
  ],
  "provenance": {
    "source_system": "Compras MX",
    "source_fetched_at": "2026-07-31T05:51:19.216Z",
    "last_seen_at": "2026-07-31T06:30:34.275Z",
    "first_seen_at": "2025-11-05T05:57:40.065Z",
    "detail_complete": true,
    "documents_complete": true,
    "content_changed_at": "2025-11-05T05:57:40.065Z"
  },
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "ao-69-323-810016962-n-2-2025",
      "nombre_procedimiento": "PAVIMENTACIÓN CON CONCRETO HIDRÁULICO DE CALLE FRANCISCO ZARCO (SEGUNDA ETAPA)",
      "dependencia": "NOMBRE DE DIOS",
      "siglas": "069323",
      "score": 0.13306408327435792,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": null,
      "fecha_publicacion": "2025-12-16T19:03:14.000Z",
      "ganador": "DAMIAN VARGAS ZAMORA",
      "ganador_slug": "damian-vargas-zamora",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "44883.09"
    },
    {
      "numero_procedimiento": "ao-69-323-810016962-n-1-2025",
      "nombre_procedimiento": "PAVIMENTACIÓN CON CONCRETO HIDRÁULICO DE CALLE FRANCISCO ZARCO",
      "dependencia": "NOMBRE DE DIOS",
      "siglas": "069323",
      "score": 0.14686943851344436,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": null,
      "fecha_publicacion": "2025-09-25T19:01:49.000Z",
      "ganador": "DAMIAN VARGAS ZAMORA",
      "ganador_slug": "damian-vargas-zamora",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "272037.98"
    },
    {
      "numero_procedimiento": "ao-91-n42-832025950-n-2-2024",
      "nombre_procedimiento": "PAVIMENTACION CON CONCRETO HIDRAULICO EN CALLE GONZALEZ ORTEGA",
      "dependencia": "091N42",
      "siglas": "091N42",
      "score": 0.1495477557182312,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": null,
      "fecha_publicacion": "2024-06-17T23:50:17.000Z",
      "ganador": "SERGIO ALEJANDRO CARREON SAUCEDO",
      "ganador_slug": "sergio-alejandro-carreon-saucedo",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "470262.47"
    },
    {
      "numero_procedimiento": "ao-69-323-810016962-n-3-2025",
      "nombre_procedimiento": "PAVIMENTACIÓN CON CONCRETO HIDRÁULICO DE CALLE FRANCISCO ZARCO TERCERA ETAPA",
      "dependencia": "NOMBRE DE DIOS",
      "siglas": "069323",
      "score": 0.15386688709259033,
      "anio_ejercicio": 2025,
      "estatus": "ADJUDICADO",
      "fecha_fallo": null,
      "fecha_publicacion": "2025-12-16T19:21:12.000Z",
      "ganador": "DAMIAN VARGAS ZAMORA",
      "ganador_slug": "damian-vargas-zamora",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "24920.55"
    },
    {
      "numero_procedimiento": "ao-85-h84-826030998-n-1-2024",
      "nombre_procedimiento": "PAVIMENTACIÓN CALLE VILLA GRANDE",
      "dependencia": "HERMOSILLO",
      "siglas": "085H84",
      "score": 0.15469270944595337,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": null,
      "fecha_publicacion": "2025-12-10T11:47:59.000Z",
      "ganador": "REVAL DESARROLLOS Y MATERIALES SA DE CV",
      "ganador_slug": "reval-desarrollos-y-materiales",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "644354.99"
    },
    {
      "numero_procedimiento": "ao-89-l55-830004979-n-7-2024",
      "nombre_procedimiento": "CONSTRUCCIÓN DE PAVIMENTACIÓN DE CONCRETO HIDRAULICO EN CALLE LIBRADA DOMINGUEZ",
      "dependencia": "089L55",
      "siglas": "089L55",
      "score": 0.15610252880438835,
      "anio_ejercicio": 2024,
      "estatus": "ADJUDICADO",
      "fecha_fallo": null,
      "fecha_publicacion": "2024-12-06T18:00:08.000Z",
      "ganador": "PICMSA CONSTRUCCION SA DE CV",
      "ganador_slug": "picmsa-construccion",
      "ganador_rfc_type": null,
      "ganadores": "1",
      "monto_mxn": "478843.31"
    }
  ]
}